![Luxier SP21-CEC Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/luxier/sp21-cec/sp21-cec_manual_1952292007.webp)
SP21-CEC
Rev. B 102019
7
Luxier
Installation
1
2
3
1. Attach shower arm assembly (1) to the panel body with the
locking nut (2). Connect the Rainfall Shower Water Connector
(3) after the shower arm is attached to the shower panel.
2. Install hand shower cradle (1) to the shower panel by
installing the rubber washer (2) and the locking nut (3) and
attach white plastic hose tube connector (5) with PVC tubing to
complete the connection. (
NOTE:
Make sure the silicon gasket
(4) is seated properly inside the connector.)
1
2
3
4
5
815mm
32.09”
3. Lift the panel to determine the proper height and placement.
It is recommened to aim the top horizontal body jet to the chest
area for optimal showering experience. Mark the positions of
the 2 brackets on the wall and set a side the panel.
(
NOTE:
The distance between the two brackets should be 815
mm or 32.09”)
1”
4. Using a drill with a tile bit, drill the hole slowly into the tile. Do
not drill into any piping or wiring in the wall. Insert the anchors
into the wall.
(
NOTE:
Before drilling the tiles, use a small piece of painters
tape or masking tape over the drill area. This will prevent dam
-
ages to the tiles)