![Luxier SP20-CEC Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/luxier/sp20-cec/sp20-cec_manual_1952290009.webp)
Luxier
SP20-CEC
Rev. A 102019
9
Installation (cont.)
8. Once the shower panel has been tested for functions and
leaks. Hang the unit on the wall to complete the installation.
Due to the limited space behind the shower panel, do not
bend the hoses. Any restrictions in the water supply hoses will
greatly reduce the performance of the shower panel. After the
shower panel is set properly on the wall, apply silicon sealant
on both sides of the shower panel to prevent the unit from
moving.
(
NOTE:
Do not seal the bottom of the panel.)
9. Connect hand shower hose to the main panel body and
connect the hand shower wand to the hose. Make sure the
silicon gaskets are seated properly to prevent water leak. The
installation process is now complete.