background image

4

BSH07S Rev. A 07/2018

Luxier USA

Installation

B

C

A. Shut off water supply at the valves. 

Remove old faucet and clean the 

mounting surface for installation of new 

faucet.

D1. Apply Teflon (TPFE) tape on the 

shut off valves. Thread the tape in 

counter-clockwise direction.

F. Remove aerator from the spout and 

let the water run for about 1 minute to 

clear any debris in the plumbing system.

Attach the aerator.

D2. Use a wrench to tighten the hoses, 

please do not overtighten the connec-

tions.

E. Turn on the water supply to check for 

leaks at all connections.

B. First place the new faucet through 

flange on the mounting surface. The 

faucet hole should be 1 3/8” in diameter 

on the mounting surface.

C. Attach the mounting rod to the 

faucet. Insert the rubber washer, metal 

washer, and secure the faucet with the 

mounting nut.

D1

Flexible water supply line

D2

E

F

A

01. 2.5 mm Allen wrench

02. Setscrew

03. Handle

04. Cap

05. O Ring

06. Bonnet

07. Cartridge

08. Body

09. EVA Washer

10. Rubber Washer

11. Metal Washer

12. Mounting Rod

13. Aerator

14. Water Supply Hoses 

(non-

removable)

1

2

3

4

5

6

7

14

8

13

9

10

11

12

Отзывы: