INSTALLATION INSTRUCTIONS AND PARTS LIST
FOR MOUNTING 401134 GRIP-STEP BRACKETS ON:
11-12 DODGE DURANGO/JEEP GRAND CHEROKEE
PLEASE READ INSTRUCTIONS COMPLETELY BEFORE INSTALLING
1.
LOCATE AND REMOVE THE SECOND, FOURTH, AND SIXTH OBROUND BODY PLUGS FROM
UNDER AND BEHIND THE PLASTIC GROUND EFFECTS. FIG.1
2.
INSTALL THE T-BOLT (ITEM #3) UP INTO OBROUND HOLE AS SHOWN IN FIG.2
3.
PLACE THE BRACKET (ITEM #2) UP AND OVER T-BOLT THREADS AND PLACE THE NUT
(ITEM #8) ON FINGER TIGHT. THEN PUT (2) CARRIAGE BOLTS (ITEM #6) IN THE OBROUND
HOLES IN THE BRACKET AND PINCH WELD AREA AND THEN NUT (ITEM #7). TIGHTEN ALL
FASTENERS.
4.
REPEAT STEPS 2 & 3 FOR EACH BRACKET ON BOTH DRIVER AND PASSENGER SIDE.
5.
ATTACH THE STEPS (ITEMS #1) TO THE MOUNTING BRACKETS.
5.1
SET THE STEP ON THE MOUNTING BRACKETS, AND SLIDE EACH SUPPORT BRACE
(ITEM #9) OVER THE TOP OF EACH MOUNTING BRACKET. ATTACH THE FLAT SPACER
PLATE (ITEM #11) TO THE BOTTOM OF THE STEP, BETWEEN THE SUPPORT BRACE, AND
THE TOP OF THE MOUNTING BRACKETS.
5.2
USING THE SUPPLIED 5/16-18 X3/4” CARRIAGE BOLT, WASHER, AND FLANGE NUTS,
(ITEM #4, 5, 10), ATTACH THE STEP ASSEMBLY, FLAT SPACER PLATE AND MOUNTING
BRACKET.
5.3
SET THE STEP PLATE IN THE CORRECT POSITION AND TIGHTEN ALL FASTENERS.
TORQUE ALL 5/16” FASTENERS TO 19 LB FT.
SERVICE PARTS LIST
ITEM
PART NO.
QTY
DESCRIPTION
1
415072
2
GRIP STEP BOARDS .72”
2
551981
6
BRACKET-MTG, GRIP STEP, 401134
3
551935
6
T-BOLT WELDMENT, ZP
4
102680
12
NUT-SERR FLG, 5/16-18, SST
5
101369
12
WSHR-PL,SST, .312 X .734 X .065
6
104260
12
BLT-CRG, #10-24 X .75, SST
7
104261
12
NUT-SERR FLG, #10-24, SST
8
103737
6
NUT-SERR FLG, 7/16-14, ZP
9
551296
6
BRC-SPRT, GRP-STP,GALV
10
108683
12
BLT-CRG, SST, 5/16-18 X 1.00
11
551298
6
SPACER-MTG, LOWER, BLK
12
551384
4
CAP-END, GRIP-STEP,PP500, BLK
13
107958
8
SCR-TEK, #8-18 X ½”, SST, BLK
Содержание 415078
Страница 1: ......
Страница 2: ......
Страница 4: ...Choose reliable running boards offered on our website...