Operation
8
© Lutz-Jesco GmbH 2018
BA-12604-02-V02
Multi-function valve
PENTABLOC
Operating instructions
5 Technical data
Description
Value
Housing material
PVC / PP / PVDF / PMMA
Seal material
FPM or CSM / EPDM
Diaphragms
FPM or CSM
Inlet connection
Union nut G 5/8 or G 3/4
Outlet connection
Tap G 5/8 or G 3/4
Opening pressure of the
safety valve
5 or 11 bar
Holding pressure
1.5 or 3 bar
Max. ambient temperature
5 - 40 °C (PVC, PMMA)
5 - 50 °C (PP, PVDF)
Max. temperature of the
medium
35 °C (PVC, PMMA)
50 °C (PP, PVDF)
Weight
210 g
Application area
Dosing pumps motor up to 45 l/h
Solenoid dosing pumps up to 8 l/h
Max. media viscosity
20 mPa ∙ s
Table 6: Technical data
6 Operation
6.1 Installation
Precondition for action:
ü
All devices have been deactivated and pressure-free.
Perform the following working steps:
1.
Connect the dosing pump connection (pos. 5) to the dosing pump
pressure valve and tighten the union nut by hand.
2.
Connect an appropriate hose to the connection to the injection
nozzle. Do not use the return hose included in the scope of delivery
for this purpose! This is not suitable for use in pressure lines.
3.
Connect a return hose to the output to the return (pos. 3).
ü
The Multi-function valve was installed successfully.
6.2 Maintenance intervals
Maintenance work to be
carried out
Frequency
Visual inspection
With use, daily
Replace seals
Annually
Table 7: Maintenance intervals