
5-5 The CT and PT measurement
A : Diagram
screen 1 ( 5-5 )
B : Operation Instructions
B-1 : Power on the instrument by pressing POWER KEY,
and then press 1
Φ
3
Φ
KEY to select the 3
Φ
4W system,
the selected name of system will be appeared on bottom
left display of screen 2.
B-2 : Connect the line voltage L1, L2, L3 and Vn to V1, V2
,V3 and N terminals of the instrument.
B-3 : Place the conductor of CP-1201(A1), CP-1201(A2),
CP-1201(A3) hook to A1, A2 , A3 as screen 1.
B-4: Connect the outputs of clamp meter CP-1201(A1),
CP-1201(A2), CP-1201(A3) to A1, A2, A3 terminals
of the instrument.
B-5: The related measuring factors will be appeared on
display, about the instruction of factor please refer
appendix 1 ( 5-16, page 68 ).
52
Содержание DW-6095
Страница 14: ...3 FRONT PANEL DESCRIPTION 1 Fig 1 10...
Страница 63: ...Screen 1 5 9 Screen 2 5 9 59...
Страница 66: ...Screen 2 5 10 Screen 3 5 10 62...
Страница 77: ...EXCEL data screen 2 for example EXCEL data screen 3 for example EXCEL data screen 4 for example 73...
Страница 78: ...EXCEL data screen 5 for example EXCEL data screen 6 for example EXCEL graphic screen 1 for example 74...
Страница 79: ...EXCEL graphic screen 2 for example EXCEL graphic screen 3 for example 75...