5
INSTALLATION: GROUND STAKE
Install three
Hex Bolt (P) into Ground Base Insert (K), and tighten with Nut (O).
Attach the Large Ground Stake (M) to the Ground Base Insert (K) by screwing three Ground Stake
Screws (Q) tight with Phillips screwdriver. Then insert Turn Rod (N).
Turn ground stake assembly clockwise by using Turn Rod (N) into the dirt until Ground Base Insert (K)
is tight against the dirt. Insert and pound the three smaller Ground Stakes (L) into the dirt with a
hammer (not included).
Note:
Make sure the bubble in the level found at the top of the Ground Stake (M) is centered and
level so the Post Assembly is in a perfect vertical position.
Содержание 12513LE-SL
Страница 2: ...2 PACKAGE CONTENTS I J K L M N O P Q A A1 B B1 C E F F1 G H D A2 B2 C1 A3 A5 A4 R...
Страница 15: ...15 CONTENU DE L EMBALLAGE I J K L M N O P Q A A1 B B1 C E F F1 G H D A2 B2 C1 A3 A5 A4 R...
Страница 28: ...28 CONTENIDO DEL EMPAQUE I J K L M N O P Q A A1 B B1 C E F F1 G H D A2 B2 C1 A3 A5 A4 R...