
ND30PNET-09 -
User's Manual
3
Fig.1. Meter set
3 BASIC REQUIREMENTS, OPERATIONAL SAFETY
In terms of operational safety the meter meets the requirements of EN 61010-1.
Safety precautions:
The meter installation and connection should be performed by qualified personnel.
All available protection requirements must be taken into consideration.
Prior to turning on the meter verify the connections.
Prior to removing the meter housing, always turn the supply off and disconnect the
measurement circuits.
Removal of the meter housing during the warranty period voids the warranty.
The meter meets the requirements for electromagnetic compatibility in industrial
environment.
A switch or a circuit-breaker should be installed in the building or facility. It should be
located near the device, easily accessible to the operator and properly marked.