5. AUDIO IN (LEFT / RIGHT)
AUDIO IN (LEFT / RIGHT)
AUDIO IN (LEFT / RIGHT)
AUDIO IN (LEFT / RIGHT) XLR Sockets. Connect a +8dB 600ohm
balanced audio feed to these sockets.
6. USB
USB
USB
USB Port
Port
Port
Port. Connect the to Windows™ PC or Laptop to program the
RDS content. Free software can be downloaded at:
lucorobroadcast.com/support
7. RF OUT
RF OUT
RF OUT
RF OUT 'N' Socket. Connect a matched, pre-tested antenna system
with a return loss of >=14dB to this socket. Ensure all parts of the
feeder and antenna system are rated for 3W or above
8. POWER
POWER
POWER
POWER.... Connect a power lead with an IEC C13 connector (and a 13
amp fuse in the plug or at the distribution panel) to this socket. Two T2
amp (time delay) fuses are fitted within this connector’s Fuse carrier.
9. EARTH.
EARTH.
EARTH.
EARTH. Grounding connection point (M4 stud and bolt).
Connect a suitable rated test load to the RF OUPUT socket before
connecting the unit to mains power. IMPORTANT! FAILURE TO DO SO
MAY RESULT IN DAMAGE NOT COVERED BY WARRANTY.
Power-up the unit and reduce the output power to the lowest level.
Using the front panel display and buttons, set the desired transmission
frequency.
The factory will have set the deviation, RDS and pilot injection levels.
They should need no further adjustment. However, if absolutely
necessary, these can be changed as follows (NOT recommended):
ELECTRIC SHOCK AND RF BURN HAZARD! DISCONNECT THE
POWER BEFORE REMOVING ANY COVERS.
To adjust the deviation level, remove the unit’s top cover and
locate the “DEV” preset trimmer control on the internal PCB.
Using a suitable trimmer tool carefully adjust the control.
To adjust the RDS level, remove the unit’s top cover and locate
the “RDS” preset trimmer control on the internal PCB. Using a
suitable trimmer tool carefully adjust the control.
Installation
Содержание FMTX1
Страница 8: ......