Lucent Technologies 1200A 24V ECS Battery Plant J85500E-2
Issue 7 October 1998
Installation 5 - 5
Battery Stand
Assembly
Assemble battery stands or shelves per the Lucent Technologies
battery manual or other battery manufacturer's documentation.
Install the batteries onto their stands.
Initial Charge
Batteries may undergo initial charging at this time, according to
the manufacturer's recommendations. One of the rectifiers may
be used for initial charging. Refer to the procedure given in the
Rectifier manual.
Cable Support
and Ground
System
Hang all cable support systems, as well as any auxiliary ground
bus bars, as dictated by the job application drawings.
Table 5-C: Installation Reference Documents
Procedure
Reference Document*
Unpacking, Handling
and Frame Installation
J85500E-2 Drawing and
Installation Template
Initial Battery Charge
Rectifier Manual
Cable Support and
Ground System
Job Application Drawings
Controller Setup and
LVD Test
Controller Manual
AC Wiring, Rectifier
Installation and
Rectifier Test
Rectifier Manual,
J85500E-2 Drawing and
T-82678-31 Drawing
Load Wiring
J85500E-2 Drawing and
T-82678-31 Drawing
Battery Connections,
Disconnect
Installation and Test
J85500E-2 Drawing and
T-82678-31 Drawing
Controller Test
Controller Manual
Load Turn Up
Load Equipment Instructions
Converter Shelf
Assembly Installation
and Test
Converter Plant Manual
*See “Documentation References” in Section 3.
Warning
Do not connect batteries to the system at this time.