Determining the Operating Status
Connecting Power to the Switch
Beta Draft Confidential
5-10
4/5/03
CBX 500 Multiservice WAN Switch Hardware Installation Guide
Figure 5-3.
Connecting an AC Power Supply
Cable Strain
Relief Clamps
Primary
Power Supply
Receptacle
Redundant
Power Supply
Receptacle
Secondary
Power Supply
Receptacle