background image

Holes for Steel Yoke

B

DETAIL B

(2Pl.) Washers

(2Pl.) 5mm x 25mm Security Screws

A

Steel Yoke

Glass Base

DETAIL A

(4Pl.) Washers

(4Pl.) Short Security Screws

Top Assembly

Bottom Plate

Pr

o

te

c

te

d

 u

n

d

e

r o

n

e

 o

r m

o

re

 o

f t

h

e

se

 U

.S

. P

a

te

n

t n

um

b

e

rs:

 3,

291,

432  3,

559,

942  3,

724

,7

98  D

ES

.270,

689  4,

613,

109

  4,

878,

645  4

,8

52,

842  D

ES

.309,

5624,

973,

023  5,

169,

114 

 5,

255,

884  5,

310,

152  5,

522

,576  5,

621,

61

4  R

e

.3

5,

677 D

ES

.398,

834  5,

826,

384  5,

941

,492  5,

964,

06

8  6,

060,

661  

6,

102,

398  6,

158,

704 6,

454,

116B

1 6,

761,

276B

2 6,

806,

425B

1

Page 2 of 2

PCEC2410B INSTALLATION INSTRUCTIONS

PCEC2410B_Install (8/08)                                              ©2008 Lucasey Manufacturing Corporation, Oakland, California                                                               www.lucasey.com

Attach the Steel Yoke to the swivel on the Glass

Base using the Short Security Screws and Flat

Washers.  See Detail A.   

Be careful not to damage the Glass Base while 

attaching the Steel Yoke.

Take the Top Assembly from Step 7 and align with

the rivets on the Bottom Plate. Slide the Top

Assembly forward until the Top and Bottom Plates

are locked together.  Make sure all of the tabs on

the Top Assembly are engaged by pushing back and

forth to make sure Top Assembly is locked in place.

This step requires two workers.

Hold the Steel Yoke so that it does not move and

lower the monitor onto the arms as indicated in 

the monitor user manual. The curved edge of the

Steel Yoke faces the front.

Secure the monitor to the Steel Yoke by screwing

the two Long Security Screws with Washers

into the holes indicated in Detail B.

6.

7.

8.

9.

Отзывы: