10
Use a 8
μ
F condenser for 100V AC motor.
If the wire to the outside touches the outside of the machine
or other objects or if it comes in contact with the hand of the
operator, use an insulated wire.
3-4
Tubing connection
Connect tubing to the machine to the discharge port
(M8
×
1).
Use tubing good for the pressure 1.0 MPa or
higher.
Clamping torque please refer to “Tightening
level for connecting section”
After connection, make sure there is no oil leakage from the
joint.
Discharge pressure of a pump is adjusted 0.8
MPa at a relief valve.
Please do not change discharge pressure.
3-5
Oil volume adjusting valve
The oil amount adjustment screw is set to the full discharge
position (maximum discharge amount) when delivered from
the factory.
Adjust the oil amount as follows.
1) Loosen the cap.
2) Loosen the needle valve by turning it counterclockwise
using a flathead screwdriver to determine the oil amount.
3) Fix the cap.
Z2 U2 U1
AC100V,φ1
Input
8μF
C
U
V
W
M4
Screw
AC200V,φ3
Input
R
T
S
Earth
Earth
Содержание ACM-II
Страница 7: ...6 1 2 2 Location of labels Inside Outside ...