background image

 

 

 

 

 

 

 SURVEY 

Getting started 

1.  Check battery status. 
2.  Check memory status. 
3.  Mount each unit. See examples at the end of this document. 
4.  First switch-on the MASTER unit and later the SATELLITE units. 
5.  Check measurements from MASTER unit and SATELLITE units. 
6.  Attention: radiant temperature sensor would need up to 20 minutes to acclimatize. 
 

Survey setup 

Go to Survey setup. 

1. 

Start/stop

:  select  the  way  to  start  survey  (manually/selected  day-time)  and  stop  survey 

(manually/selected  day-time/after  a  period  time).  During  survey  all  measurements  are 
stored. 

2. 

Nr survey

: Heat Shield assign a progressive number to each survey. It is possible to change 

(1 ÷ 99) the first assigned number during measurement. 

3. 

Mode

: Heat Shield can perform measurement from the base unit only (

WBGT1 amb

), from 

MASTER unit plus one SATELLITE (

WBGT 2 amb

), from MASTER unit plus two SATEL-

LITE units (

WBGT 3 amb

). Or perform one measurement which show average value of the 

measurement  coming  from  base  unit  and  two  SATELLITE  units  (

WBGT  subject, 

WBGT+PMV/PPD

) as per ISO7243-1989 requirements. 

4. 

Subject parameters

: define the parameters of the subject according to the selected survey 

mode, in order to produce the calculation of indices whose result is applicable to the subjects 
considered. 

5. 

Anemometer

: if not connected select 

Not used

 or select a default air speed value, otherwise 

specify the type: 

Hot wire

 or 

Rotor

 anemometer. 

6. 

Measure unit

: select 

Celsius

 or 

Fahrenheit

 

Survey start/stop 

Each survey starts and stops using the programmed mode. 
The start end stop commands are enabled only in the measurements mask. 

If starting mode is manual, push 

+

 to start. Push 

+

 to stop survey, this stops 

survey anyway even if automatic stop mode is programmed. 
 

You can pause an active survey at any time by pressing 

+

. While paused, the instrument 

will update and show measures on the display, but data logging is stopped. By pressing again 
the same key combination, the data logging resumes normally. While paused, the instrument 

will show a ‘

P

’ in the top

-left of the display. 

 

 

Содержание Heat Shield

Страница 1: ...INSTUM_01515 MW6175 upd 11 07 2022 Heat Shield Quick user guide...

Страница 2: ...Tripod mounting BVA325 5 Reset 6 Power supply battery charger 7 Anemometer input 8 RS 232 serial port 9 Wet bulb temperature sensor 10 Air temperature sensor 11 Radiant temperature sensor 12 Working s...

Страница 3: ...e language using and confirm using Change date time Move the cursor below the date to change using change the date and or time using Press to confirm Press to exit Measurement display Heat Shield MAST...

Страница 4: ...rvey s on programmed survey during survey it is time to reach the end of the survey s During survey it is the time from the beginning of the survey It is available only if survey end has not been prog...

Страница 5: ...menu Use to scroll each in formation and to enter to return to previous selection it goes to Measurements when pushed from MAIN menu Change parameters Depending by the situation it is possible to chan...

Страница 6: ...ow average value of the measurement coming from base unit and two SATELLITE units WBGT subject WBGT PMV PPD as per ISO7243 1989 requirements 4 Subject parameters define the parameters of the subject a...

Страница 7: ...l the instrument is found Select end to terminate this procedure To detect the PC port where the USB adapter is connected go to Windows Control Panel Device Manager Univer sal Serial bus controller an...

Страница 8: ...8 EXAMPLES Fig 1 WBGT 1 environment measurement and index from MASTER unit only Fig 2 WBGT environments separate measurements and indexes from MASTER unit and one SATELLITE unit...

Страница 9: ...Subject Fig 4 WBGT subject measurements and indexes averages from the MAS TER and 2 SATELLITE units Fig 5 Usage of WBGT 1 env with cup anemometer Fig 6 Use without data storing Fig 7 Usage of WBGT 1 e...

Страница 10: ...uipment WEEE It is therefore not to be collected with any other kind of waste LSI LASTEM is liable for the compliance of the production sales and disposal lines of Heat Shield safeguarding the rights...

Страница 11: ...11...

Страница 12: ...12 www lsi lastem com...

Отзывы: