![LS ELECTRIC LSLV-H100 Series Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798053.webp)
Installing
the Inverter
40
Function
Label
Name
Description
24
24 V power supply
-Maximum output current: 100 mA
-Do not use this terminal for any purpose other
than supplying power to a PNP mode circuit
configuration (e.g. supplying power to other
external devices).
A1/C1/B
1
Fault relay output
A,B contact
Sends o
ut alarm signals when the inverter’s
safety features are activated.
( N.O.: AC250 V
≤
2 A , DC 30 V
≤
3 A
N.C.: AC250 V
≤
1 A , DC 30 V
≤
1 A)
Fault condition: A1 and C1 contacts are
connected (B1 and C1 open connection)
Normal operation: B1 and C1 contacts are
connected (A1 and C1 open connection)
Factory default: Frequency
A2/C2
A3/C3
A4/C4
A5/C5
Multi-function
relay output A
contact
Defined in the inverter signal features such as
output via the multi-function output terminal.
(AC 250 V
≤
5 A, DC 30 V
≤
5 A).
S+/S-
/SG
RS-485 signal line
Used to send or receive RS-485 signals. Refer to
7
Communication Features on page
for more details.
Note
•
While making wiring connections at the control terminals ensure that the total cable length
does not exceed 165 ft (50 m).
•
Ensure that the length of any safety related wiring does not exceed 100 ft (30 m).
•
Ensure that the cable length between the keypad and the inverter does not exceed 10 ft
(3.04 m). Cable connections longer than 10 ft (3.04 m) may cause signal errors.
•
Use ferrite material to protect signal cables from electro-magnetic interference.
•
Take care when supporting cables using cable ties, to apply the cable ties no closer than 6
inches from the inverter. This provides sufficient access to fully close the terminal cover.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...