background image

 

LORENZ MESSTECHNIK GmbH

 

Obere Schloßstr.131 
D-73553 Alfdorf

 

 +49 7172/93730-0 

Fax +49 7172/93730-22

 

 

 

E-Mail:   [email protected] 

Technical changes are under reserve 

090120k 

Internet:  

www.lorenz-sensors.com

 

 

14 of 16 

 

 
Caution: 

 

 

 

Clean  the  housing  with  a  soft  and  slightly  moisturized  cloth.  Never  use  sol-
vents, as they may damage the front panel labeling and the display panel.  

 

 

While cleaning, ensure that no liquids enter the device or the connections  

 
 

 
Preventive maintenance and inspection: 

 

 

Note: 

 

 

 

Check the plug connections.  

 
 

Repair: 

 

 

Note: 

 

 

 

The device does not contain any parts which must or can be serviced by the 
user. Repairs may be carried out by 

Lorenz Messtechnik GmbH

, exclusive-

ly. If assuming that safe operation of the device is no longer possible, it must 
be taken out of service and secured against inadvertent  operation,  immedi-
ately.  
This applies in particular, if: 

 

-  the device shows visible damage 
-  the device is no longer functional 
-  parts of the device are loose 
-  the connection lines show visible damage 

 

 

 

 

 

Содержание GM 40

Страница 1: ...LORENZ MESSTECHNIK GmbH Obere Schlo str 131 D 73553 Alfdorf 49 7172 93730 0 Fax 49 7172 93730 22 Operation Manual DIN Mounting Rail SG Measuring Amplifier GM 40...

Страница 2: ...rve 090120k Internet www lorenz sensors com 2 of 16 1 Imprint Manufacturer Place Lorenz Messtechnik GmbH D 73553 Alfdorf Valid for DIN Mounting Rail SG Measuring Amplifier GM 40 Copyright Note 2012 20...

Страница 3: ...may only be operated in accordance with the applications prescribed in this manual Built in appliances may be used professional installations only With the connection and commissioning of the device t...

Страница 4: ...m the respective sales contract in which the warranty is conclusively settled 2 2 Intended Use Lorenz Messtechnik GmbH devices may only be used for measurement tasks and the directly related control t...

Страница 5: ...els on containers and packages must be noted 3 Installation operation and maintenance work may only be carried out by accordingly trained per sonnel under observance of the given instructions If one o...

Страница 6: ...o lorenz sensors com Technical changes are under reserve 090120k Internet www lorenz sensors com 6 of 16 3 Continuative Documents Following documents contain reference information about the DIN Mounti...

Страница 7: ...perating Mode 9 6 1 Terminal assignment 9 6 2 Switching the Device on 9 6 3 Adjustments 9 6 3 1 Adjustment of the coding switches 9 6 3 2 Presetting of the sensitivity gain 9 6 3 3 Adjustment of the i...

Страница 8: ...ontrol signal available in the sensor Thus the adjustment and the subsequent evaluation can be checked at any time All the controls are accessible behind a removable plexiglass on the front panel 5 2...

Страница 9: ...LED 6 3 Adjustments 6 3 1 Adjustment of the coding switches Option 1 5 mV V Option 4 5 mV V Option 10mV V S1 On Activation of 100 control signal S2 On U Out 10V Off U Out 5V S3 S5 Off Zero point at 1...

Страница 10: ...this see zero point adjustment 4 Activate 100 control signal with S1 Set output to 10 000V 5 000V with pot gain 5 Switch off 100 control signal and check zero point if necessary repeat the adjustment...

Страница 11: ...cted from mains during any connection procedures Note the safety precautions 6 6 Terms Definition Nominal Load e g 100kN 63Nm is indicated on the sensor and on the test certificate The nominal load is...

Страница 12: ...other appropriate measures such as grounding cable shielding etc 6 7 Troubleshooting No Output Signal available No supply voltage _ Power LED must be on Sensor not connected or open circuit in the se...

Страница 13: ...res before the installation Caution The device may not be connected to the power supply system directly The specifications of the supply voltage in chapter 5 2 must be considered Cable connections Cau...

Страница 14: ...liquids enter the device or the connections Preventive maintenance and inspection Note Check the plug connections Repair Note The device does not contain any parts which must or can be serviced by th...

Страница 15: ...sensors com Technical changes are under reserve 090120k Internet www lorenz sensors com 15 of 16 7 5 Safe Disposal Equipment disposal Please dispose obsolete equipment in accordance with the applicab...

Страница 16: ...MESSTECHNIK GmbH Obere Schlo str 131 D 73553 Alfdorf 49 7172 93730 0 Fax 49 7172 93730 22 E Mail info lorenz sensors com Technical changes are under reserve 090120k Internet www lorenz sensors com 16...

Отзывы: