
4
USSC
INST
INST
INST
INST
INSTALLA
ALLA
ALLA
ALLA
ALLATION INSTR
TION INSTR
TION INSTR
TION INSTR
TION INSTRUCTIONS
UCTIONS
UCTIONS
UCTIONS
UCTIONS
The following Diagram (Diagram Nº 2) serves as a reference for the installation of your heater with the ventilation provided
with the unit. The template that is provided with the heater can also be used. In this case, fold it at the dotted line 7” below
the heater which indicates the floor level, and make it coinciding with the floor level as a minimum, fix it to the wall with
adhesive tape. Also take into consideration the other minimum distances shown on Diagram Nº 1.
Dia
Dia
Dia
Dia
Diagram Nº 2
gram Nº 2
gram Nº 2
gram Nº 2
gram Nº 2
Model - D
Model - D
Model - D
Model - D
Model - DV12
V12
V12
V12
V12
Model - D
Model - D
Model - D
Model - D
Model - DV20
V20
V20
V20
V20
MINIMUM CLEARANCES
MINIMUM CLEARANCES
MINIMUM CLEARANCES
MINIMUM CLEARANCES
MINIMUM CLEARANCES TTTTTO COMB
O COMB
O COMB
O COMB
O COMBUSTIBLES
USTIBLES
USTIBLES
USTIBLES
USTIBLES
Rear
0 Inches / 0mm (to bracket)
Sides
6 Inches / 15cm
Top
24 Inches / 61cm
Floor
7 Inches / 18cm (to top of carpeting, tile, etc.)
Dia
Dia
Dia
Dia
Diagram Nº 1
gram Nº 1
gram Nº 1
gram Nº 1
gram Nº 1
SBI Stove Builder International Inc.
4