background image

2

INSTALLATION

GENERAL INSTALLATION NOTES

IMPORTANT: READ ALL INSTRUCTIONS CAREFULLY 
BEFORE PROCEEDING. STRUCTURE MEASUREMENTS 
MUST BE VERIFIED AGAINST THE UNIT. ENSURE THE 
STRUCTURE MEETS THE REQUIRED DIMENSIONS, IT IS 
LEVEL AND SQUARE.

Check that floor is level, adjust as necessary. Shimming may be 
required to level the bathware unit to ensure adequate drainage. 
Levelling must be done under the wood base beneath the unit. 
Do not level directly behind or under the flange and/ or at the 
front of the unit.

ALWAYS ENSURE THAT THE SURFACE OF THE UNIT IS 
PROTECTED TO PREVENT SCRATCHES IN THE SURFACE.

INSTALLATION STEPS

1. Unpack the bathtub and be very careful during installation

so as to not damage the acrylic surface of the tub.

2. Position the tub in the area where it will be installed. Mark

the centre of the drainage line in relation with the desired
position of the bathtub. 

(

Figure 1

)

3. Carefully remove the tub interior from the apron of the tub

by lifting the tub interior from its fastening/alignment pins.

(

Figure 2

)

4. Align the centre of the drainage line with the sub-floor

Cutout Template. Cut a 6-1/2" (16.5 cm) hole into wood
sub-floor (use supplied Cutout Template).

5. Measure and cut ABS Tailpiece as necessary to ensure a

secure connection to P-Trap below.

6. Insert Drain assembly into floor opening and connect to

pipe below.

7. Affix to sub-floor with 6 screws (not supplied)

8. Install flooring surface, leaving a 6-1/2" opening to access

Drain.

Every effort has been made to offer the most current, correct, and clearly expressed information possible. Nevertheless, inadvertent errors or inaccuracies in the information may occur. 

Longevity Acrylics disclaims any responsibility for errors or accuracy of information that may be contained in its documents or web pages. Longevity Acrylics Inc. makes no warranties or 

representations whatsoever regarding the quality, content, completeness, suitability, adequacy, sequence, accuracy or timeliness of such information and data.

centre of
drain location

FIGURE  1

mounting brackets

alignment pins

FIGURE  2

Отзывы: