![LONGER Orange120 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/longer/orange120/orange120_user-manual_1938578013.webp)
10
www.longer3d.com [email protected]
after the current layer is printed).
5.5 Leveling
1) Turn on the printer, move up the Z aix, take out the building
plate, install it as the picture belowed.
2) Loosen the four leveling fixed screws with hexagon wrench
4mm to make the building plate can move along Z axis freely.
3) Loosen the “vat fixed screw”, take down the resin vat, put
two pieces of A4 paper on the LCD screen. Move down the
building platform to home position, press and hold it, then
fasten the leveling fixed screws diagonally.
Содержание Orange120
Страница 40: ...37 www longer3d com info longer3d com...