background image

ONSTAGE INCUBATION SYSTEM 
INSTALLATION GUIDE

This Installation Guide provides instructions for installing the onstage incubation system for the CELENA

®

S. 

For detailed instructions, refer to the provided user manuals.

1.

Connect all tubes and cables.

2.

Fill the humidifying column with 130 mL ultrapure water. 

3.

Turn on all gases to 1 bar of pressure.

4.

Turn on the gas mixer and temperature controller and set the settings as desired. 

ORDER OF INSTALLATION

CONNECTIONS

Gas mixer

Inputs

- CO

2

: green tube

CO

tank

- Air/O

2

: blue tube

air pressure generator 

- N

2

: yellow tube 

air pressure generator 

Outputs

- Blue tubes 

Humidifying Column

- Heating connection 

Humidifying column 

- Humidity sensor 

Heated lid

Temperature controller

- Channel 1

Heated lid

- Channel 2

Heated plate

Humidifying 

column

CO

tank

Gas mixer

Heated lid

Heated

plate

CH 2

HEATER

SENSOR

Air pressure 

generator

N

tank

(Optional)

Temperature

controller

VC1707-01
© 2017 Logos Biosystems, Inc. All Rights Reserved.

Logos Biosystems | www.logosbio.com

1.

Place the CELENA S vessel holder frame on a flat surface.

2.

Place the heated plate in the vessel holder frame. 

3.

Place a heating insert in the heated plate.

4.

Place the heated lid on top of the heated plate. 

5.

Place the assembled incubator on to the CELENA S stage and connect the vessel holder frame to the vessel holder frame arm.

STAGE ASSEMBLY

Отзывы: