ONSTAGE INCUBATION SYSTEM
INSTALLATION GUIDE
This Installation Guide provides instructions for installing the onstage incubation system for the CELENA
®
S.
For detailed instructions, refer to the provided user manuals.
1.
Connect all tubes and cables.
2.
Fill the humidifying column with 130 mL ultrapure water.
3.
Turn on all gases to 1 bar of pressure.
4.
Turn on the gas mixer and temperature controller and set the settings as desired.
ORDER OF INSTALLATION
CONNECTIONS
Gas mixer
Inputs
- CO
2
: green tube
CO
2
tank
- Air/O
2
: blue tube
air pressure generator
- N
2
: yellow tube
air pressure generator
Outputs
- Blue tubes
Humidifying Column
- Heating connection
Humidifying column
- Humidity sensor
Heated lid
Temperature controller
- Channel 1
Heated lid
- Channel 2
Heated plate
Humidifying
column
CO
2
tank
Gas mixer
Heated lid
Heated
plate
CH 2
HEATER
SENSOR
Air pressure
generator
N
2
tank
(Optional)
Temperature
controller
VC1707-01
© 2017 Logos Biosystems, Inc. All Rights Reserved.
Logos Biosystems | www.logosbio.com
1.
Place the CELENA S vessel holder frame on a flat surface.
2.
Place the heated plate in the vessel holder frame.
3.
Place a heating insert in the heated plate.
4.
Place the heated lid on top of the heated plate.
5.
Place the assembled incubator on to the CELENA S stage and connect the vessel holder frame to the vessel holder frame arm.
STAGE ASSEMBLY