Check Opening Dimensions:

The sliding stairway will work with most ceiling thicknesses from
160mm. If the ceiling thickness is greater han 355mm, please
call for additional instructions. Please refer to

 Fig.2

 and

  Table 2

to check that the size of the rough and finished openings are
correct for your specific model.

Model

 

  Rough
Opening

Inside  Dim.

Finish

Opening

Inside  Dim.

Guide Frame

Slide Bar

Inside  Width

400 Size 1-4 

 660  x
1727mm

611  x

1680mm

422mm

400 Size 5-7 

 660  x
1879mm

611  x

1830mm

422mm

700 Size 1-4 

 812  x
1727mm

764  x

1680mm

468mm

700 Size 5-7 

 812  x
1879mm

764  x

1830mm

468mm

Table  2

Fig.2

Fig.1

Check Model Size:

Be sure to check the

 storage height

 (C) and

 storage length

(B) above the handrail. Please refer to

 Fig.1

 and

 Table 1

 to

ensure that the size of your specific model fits within the
specified requirements.

Size

(A)

Floor to

Floor (mm)

(B)

Radius
Height

(mm)

(C)

Storage

Height

(mm)

(D)

Going

(mm)

1

 

2311 to

2412

 

1244 

889 

1625

2

 

2413 to

2564

 

1422 

1041 

1727

3

 

2565 to

2717

 

1600 

1193 

1828

4

 

2718  to

2869

 

1778 

1346 

1930

5

 

2870  to

3021

 

1778 

1371 

2032

6

 

3022  to

3174

 

1981 

1549 

2108

7

 

3175  to

3302

 

2159 

1651 

2235

Table  1

BEFORE YOU INSTALL THE LADDER

PLEASE CHECK ALL PARTS BEFORE COMENCING CONSTRUCTION

You should have

 three

 parcels:

1 - Contains the hardware, fittings, instructions and treads
2 - Door predrilled for door guide frame and screw eye
3 - Strings and handrail with uprights

Check Guide Frame Slide Bars

Check

 header guide frame

 and

 door guide

frame slide-bars

 for alignment. The Model 400

should be 422mm across the inside of the side
bars and parallel. The 700 should be 468mm
across. You may adjust the slide bars by bending
the brackets slightly in or out as needed.

Door Guide Frame

Header Guide Frame

Slide Bar

s

3

Содержание Caernarvon 400

Страница 1: ...Caernarvon 400 700 Fitting Instructions 1...

Страница 2: ...Spring Drum Assemblies 7 Door Drum 8 StringDrum 9 Pulleys 10 Door Guide Frame 10a Slide Bars 11 Door Cables 12 String Cables 13 String Cable Holders 14 Catch Lock 15 Door 16 Door Hinge 17 Top Tread 18...

Страница 3: ...of your specific model fits within the specified requirements Size A Floor to Floor mm B Radius Height mm C Storage Height mm D Going mm 1 2311 to 2412 1244 889 1625 2 2413 to 2564 1422 1041 1727 3 2...

Страница 4: ...screws Remove the slats and trim the door opening on ceiling with architrave Step 1 Preparation of the rough opening Prepare the rough opening to the size shown in Table 2 Double headers may be neede...

Страница 5: ...n holes in each spring drum assembly Pre drill all holes using a 3mm drill bit Step 7 Install left spring drum assembly No 6 in the same manner as the right assembly Header Installing Hardware You hav...

Страница 6: ...POINT DOWNWARDS and the catch pin is on the left side of the string Slide the Door Guide Frame all the way to the bottom of the stairs DO NOT FORCE as this may spread the bars or damage the brackets S...

Страница 7: ...and fasten with M6 x 30mm bolts M6 nuts Step 18 Stringing the Cables On the Spring Drum Assembly both cables are attached to a shipping fork The drums are shipped with tension to keep cables secure D...

Страница 8: ...ring guide channel or tear the door guide frame No 10 from the door NB Refer to Step 25 for final adjustment of tension Step 25 Adjusting Spring Drum Tension Always work towards using the minimum amou...

Страница 9: ...ire length of travel Lubricate guide channel with silicone grease Look for gouge marks and check width of stairs at that point see table A Check seating of treads Check to see if the stair is centred...

Отзывы: