background image

YARN

MASTER

®

 3N1

46376003en

Fitting Instruction 
RIFA RS40

Содержание YARNMASTER 3N1

Страница 1: ...YARNMASTER 3N1 46376003en Fitting Instruction RIFA RS40...

Страница 2: ......

Страница 3: ...further company and product names are trading names or registered trademarks of the relative companies The content of this Operating Instruction is protected by cop yright All rights reserved No part...

Страница 4: ...4 3N1 INHALTSVERZEICHNIS...

Страница 5: ...11 Fitting of Sensors 12 Cabling of the Section Electronic SE 14 Connections to RIFA 15 Connections to PLC 15 Connections to Power Board 16 Earthing of SE Board 18 SE Address 19 Labeling of SE Board 1...

Страница 6: ...3N1 Software 26 SCU Software Upgrade 26 Software for Section Electronic Q Board 28 Specifications 29...

Страница 7: ...with all safety checks installation and service guidelines Switch off the power of the spinning machine before servicing The disconnection device of the SE UNIT 3N1 is locat ed inside in the SE UNIT 3...

Страница 8: ...liance with the safety operating and mainte nance instructions contained in this Manual The use of spare parts non OEM parts conversion parts not supplied by us Unauthorized conversion and modificatio...

Страница 9: ...A RS40 rotor spinning frames In this manual quality is abbreviated as Q foreigner fibre as FF and polypropylene as PP This manual has been written for software A700909 V8 08 Parts List LOEPFE Descript...

Страница 10: ...h screen Keyboard and mouse connection via USB possible Microsoft Windows CE Connection 24V DC SELV 25 15 Max Current 4A Fuse 2xT3 15AL RS40 Up to 480 clearers can be connected Settings side RS40 1 se...

Страница 11: ...eed Sensor LAN to Q Board The power supply must be installed by an electrician Cabling SCU Front Black Power Supply from machine 24V 30W Red Speed Sensor from RIFA Yellow LAN to SE Electronic Blue Gro...

Страница 12: ...re the sensors and screw the mounting piece to the sensor Screw the sensing head into the existing hole of the bar and position it in the middle of the hole of the mounting piece It is necessary to do...

Страница 13: ...NG OF SENSORS At least the measuring slit should be in the range of the press roller Picture If this is not so the metal bar with with screwed on sensor should be slided This should be done by the mil...

Страница 14: ...RIFA Red Stop cable IF to connect the SAG Blue Ground from SE to machine ground For exact cabling see the following description Before starting with the cabling the sensors should be fitted View from...

Страница 15: ...ons to PLC Connections COM0 COM1 0V OUT COM0 PLC Controller RIFA RIFA PLC 3N1 Stop cable A5008541 3N1 Stop cable A5008542 0 0 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16...

Страница 16: ...16 3N1 CABLING OF THE SECTION ELECTRONIC SE Connections to Power Board 24V Power cable for SE 3N1 Power Board RIFA...

Страница 17: ...NIC SE Q Board Connections Red Stop cable 1 Upper A5008541 2 Lower A5008542 White Power supply 24 V from Power Board RIFA Yellow LAN to SCU is splitted by each section see the following picture Blue G...

Страница 18: ...crew must be screwed onto the Q Board at the upper left side as illustrated The earthing is assured by the machine ground The ground wire can simply be laid along the side panel Machine Ground Diagram...

Страница 19: ...r As soon as the Q Boards are placed the attached stickers must be fixed This marking serves for a correct cabling and helps in case of exchange Blue SE Board number Yellow first and last rotor number...

Страница 20: ...rd Cable from the sensor to the inside of the machine Use the support different types available Inside view of the backside of the rotor For sensor cable layings an orderly laying is necessary to avoi...

Страница 21: ...chine Configuration Side s Enter the number of spinning units of each machine side Note After saving the settings the picture in the Machine Overview page is adapted Number of piecers Service menu Mac...

Страница 22: ...H Replace SH Hardware QB lock 7 Maximum intensity signal F channel Machine is producing blended yarn SH defective Disable F channel of YM 3N1 Replace SH Hardware QB lock 8 Minimum intensity signal P c...

Страница 23: ...plier Data Renata CR2477 Replacing battery The battery holder is polarity protected This mains if the batteries is placed reverse there is no risk of danger Replacement instruction Battery is placed w...

Страница 24: ...8 5 5 5 6 5 6 6 6 7 80 7 5 5 7 PP 7 PP PP 7 PP PP 7 PP PP 7 PP PP 7 PP 7 PP 736 8 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 73 7...

Страница 25: ...ware is automatically sent to the SE Board by the SCU Replacing a Detector Part number A905257100 basic A905257000 full 1 Lock the spinning unit 2 Disconnect the detector cable 3 Loosen the two nuts a...

Страница 26: ...ere is one copy this temporarily to your hard disk or rename it but remove it from the memory stick Best Case take an empty USB stick 4 Copy the file Open End VX XX Build XXXXXX Upgrade exe to the mem...

Страница 27: ...xt machine and repeat this procedure from step 6 Start a new lot No need to put in the settings again There is no downgrade possible Upgrade Procedure by Means of Changing the Compact Flash 1 Save all...

Страница 28: ...machine 2 Switch off the Power of the SCU 3 Open the cover of the SCU 2 screws 4 Replace the old flash EPROM with then new one use a special gripper L Low for U23 left side H High for U24 right side...

Страница 29: ...ts J48 J49 Type of output open collector number of outputs 2 x 12 outputs Max output current output 5mA Max output voltage if output is active Supply voltage Min output voltage if output is active Sup...

Страница 30: ...Loepfe Brothers Ltd 8623 Wetzikon Switzerland Phone 41 43 488 11 11 Fax 41 43 488 11 00 info loepfe com www loepfe com Subject to technical modifications...

Отзывы: