COMMISSIONING AND TESTING 

 

7.1

 

ELECTRICAL INSTALLATION 

 
Any  ancillary  item  that  requires  an  electrical  supply  should  be  installed  and  commissioned  as  per 
instructions. 
 

7.2

 

WATER CONNECTION 

 
For design see Section 5: Water connections 
 

 

The system should be thoroughly flushed out with cold water without any 
circulating pumps in position. Ensure all the valves are open. 

 
 
If  a  building  return  pump  is  to  be  fitted,  it  should  be  fitted  before  the  system  is  filled  and  air  locks 
cleared.  Check the system for leaks and repair as necessary. If the system is configured in an unvented 
arrangement, check the expansion vessel cushion pressure. 
 

7.3

 

PRIMARY HEAT SOURCE 

 
The  primary  heat  source  operating  in  conjunction  with  the  storage  vessel  should  be  installed  and 
commissioned in accordance with the relevant ICM Instructions provided. 
 

8.0

 

MAINTENANCE 

 

8.1

 

GENERAL 

 
Regular servicing is recommended, preferably by a Lochinvar appointed person, to ensure trouble free 
operation.  Even if a maintenance schedule is determined to be less than annually, it is important that 
all controls and safety features are checked for correct operation on an annual basis. 
 

8.2

 

MAINTENANCE SCHEDULE 

 
It is good practice to service the SST every 12 months. Lochinvar Limited recommend that this is the 
maximum service interval, however in hard water areas, it may be necessary to reduce this time period 
to ensure correct operation of the storage vessel and associated equipment. 
 

8.3

 

DRAINING THE WATER SYSTEM 

 
Maintenance and service procedures for the SST require draining the water heater.  The water heater 
must also be drained if it is to be shut down and exposed to freezing temperatures.   
 

1.

 

Turn off the water heater if applicable. 

2.

 

Connect a hose to the system drain valve. 

3.

 

Locate hose’s discharge in an area where hot water will not cause any damage or injury. 

4.

 

Close the cold-water inlet valve to water heater system. 

5.

 

Open a nearby hot water outlet to vent the system. 

6.

 

Open the drain valve. 

7.

 

If the vessel is being drained for an extended shutdown, it is suggested the drain valve be left 
open during this period. 

 
 
 

Содержание SST Series

Страница 1: ...Models SST66 SST110 SST165 SST220 Installation manual_SST_JANUARY 2019 SST DIRECT STORAGE VESSEL Installation Commissioning Maintenance and User instructions...

Страница 2: ...1...

Страница 3: ...MMENDED PIPEWORK FOR A CONDENSING CIRCULATING APPLIANCE 8 6 3 2 RECOMMENDED PIPEWORK FOR A STORAGE APPLIANCE 8 6 3 3 TEMPERATURE AND PRESSURE RELIEF VALVE 9 6 3 4 RELIEF VALVE DISCHARGE PIPEWORK 9 6 3...

Страница 4: ...g stage All installations must conform to the relevant Building Regulations Health Safety requirements must also be taken into account when installing any equipment Failure to comply with the above ma...

Страница 5: ...symbol added to a yellow triangle with black edges indicates danger ACTION REQUIRED A white symbol inserted in a blue circle indicates an action that must be taken to avoid risk READ AND UNDERSTAND TH...

Страница 6: ...750 2055 1550 1030 530 445 410 375 290 SST220 1000 1907 1080 1536 1221 906 591 506 471 436 351 2 2 1 CONNECTION HEIGHTS AND DIMENSIONS No Description Size BSP Model reference 1 Spare 1 All 2 Hot Outle...

Страница 7: ...ign installation testing and maintenance of services supplying water for domestic use within buildings and their curtilages BS 7074 1989 Application selection and installation of expansion vessels and...

Страница 8: ...e appliances please contact Lochinvar Limited 6 2 1 RECOMMENDED PIPEWORK FOR A CONDENSING CIRCULATING APPLIANCE 6 2 2 RECOMMENDED PIPEWORK FOR A STORAGE APPLIANCE BUILDING RETURN BUILDING FLOW IV STOR...

Страница 9: ...and must comply with The Building Regulations Part G3 in England and Wales P5 in Northern Ireland and P3 in Scotland A kit of components that have been suitably sized for the unvented or boosted oper...

Страница 10: ...d maintenance of services supplying water for domestic use within buildings and their curtilages b Have a vertical section of pipe at least 300mm long below the tundish before any elbows or bends in t...

Страница 11: ...TAL DISCHARGE PIPE D1 FROM TEMPERATURE RELIEF VALVE TO TUNDISH SAFETY DEVICE e g TEMPERATURE RELIEF VALVE DISCHARGE PIPE D2 FROM TUNDISH WITH CONTINUOUS FALL FIXED GRATING TRAPPED GULLY DISCHARGE IDEA...

Страница 12: ...d at a consistent temperature throughout By achieving a uniformed stored water temperature of at least 60 C the risk of any bacterial contamination is virtually eliminated If the SST is to be installe...

Страница 13: ...ouble free operation Even if a maintenance schedule is determined to be less than annually it is important that all controls and safety features are checked for correct operation on an annual basis 8...

Страница 14: ...r fixture to allow air to escape 3 Open the cold water supply to water heater and allow the vessel to fill 4 Check for water leakage 8 6OTHER CHECKS 8 6 1 RELIEF VALVE At least once a year the tempera...

Страница 15: ...the water may sometimes appear milky This is due to very tiny air bubbles in the water which will clear very quickly Warning If cold warm water exits from the temperature and pressure relief valve TP...

Страница 16: ...15...

Отзывы: