background image

2  

Maintenance 

(continued)

Service Manual

25

Flue vent system and air piping

1.

Visually inspect the entire flue gas venting system and air
piping for blockage, deterioration or leakage.  Repair any
joints that show signs of leakage. Verify that air inlet pipe
is connected and properly sealed.

2.

Verify that boiler vent discharge and air intake are clean
and free of obstructions.

Failure to inspect for the above conditions
and have them repaired can result in
severe personal injury or death.

Check water system

1.

Verify all system components are correctly installed and
operational.

2.

Check the cold fill pressure for the system.  Verify it is
correct (must be a minimum of 12 psi).

3.

Watch the system pressure as the boiler heats up (during
testing) to ensure pressure does not rise too high.
Excessive pressure rise indicates expansion tank sizing or
performance problem.

4.

Inspect automatic air vents and air separators.  Remove
air vent caps and briefly press push valve to flush vent.
Replace caps.  Make sure vents do not leak.  Replace any
leaking vents.

Check expansion tank

1.

Expansion tanks provide space for water to move in and
out as the heating system water expands due to
temperature increase or contracts as the water cools.
Tanks may be open, closed or diaphragm or bladder type.
See Section 6 - Hydronic Piping of the Knight Boiler
Installation and Operation Manual for suggested best
location of expansion tanks and air eliminators.

Check boiler relief valve

1.

Inspect the relief valve and lift the lever to verify flow.
Before operating any relief valve, ensure that it is piped
with its discharge in a safe area to avoid severe scald
potential.  Read Section 6 - Hydronic Piping of the
Knight Boiler Installation and Operation Manual before
proceeding further.

Safety relief valves should be re-inspected
AT LEAST ONCE EVERY THREE YEARS,
by a licensed plumbing contractor or
authorized inspection agency, to ensure
that the product has not been affected by
corrosive water conditions and to ensure
that the valve and discharge line have not
been altered or tampered with illegally.
Certain naturally occurring conditions
may corrode the valve or its components
over time, rendering the valve inoperative.
Such conditions are not detectable unless
the valve and its components are
physically removed and inspected.  This
inspection must only be conducted by a
plumbing contractor or authorized
inspection agency – not by the owner.
Failure to re-inspect the boiler relief valve
as directed could result in unsafe pressure
buildup, which can result in severe
personal injury, death, or substantial
property damage.

Following installation, the valve lever
must be operated AT LEAST ONCE A
YEAR to ensure that waterways are clear.
Certain naturally occurring mineral
deposits may adhere to the valve,
rendering it inoperative.  When manually
operating the lever, water will discharge
and precautions must be taken to avoid
contact with hot water and to avoid water
damage.  Before operating lever, check to
see that a discharge line is connected to
this valve directing the flow of hot water
from the valve to a proper place of
disposal.  Otherwise severe personal injury
may result.  If no water flows, valve is
inoperative.  Shut down the boiler until a
new relief valve has been installed.

2. After following the above warning directions, if the relief

valve weeps or will not seat properly, replace the relief
valve.  Ensure that the reason for relief valve weeping is
the valve and not over-pressurization of the system due to
expansion tank waterlogging or undersizing.

WARNING

WARNING

WARNING

Содержание Knight 80 - 285

Страница 1: ...service technician Read all instructions including this manual and the Knight Boiler Installation and Operation Manual before installing Perform steps in the order given Failure to comply could resul...

Страница 2: ...ant but not related to personal injury or property damage CONTENTS 2 Hazard Definitions 2 PLEASE READ BEFORE PROCEEDING 3 Handling Ceramic Fiber Materials 3 When servicing boiler 4 Boiler operation 4...

Страница 3: ...n this product contains ceramic fiber material Ceramic fibers can be converted to cristobalite in very high temperature applications The International Agency for Research on Cancer IARC has concluded...

Страница 4: ...ve sediment The high efficiency heat exchanger can be damaged by build up or corrosion due to sediment Do not use petroleum based cleaning or sealing compounds in the boiler system Gaskets and seals i...

Страница 5: ...n Knight boiler operation A General B Temperature Setting C Data Logging D Functions E DHW Settings F Outdoor Air Reset Curve G Anti cycling H Control Modes I Circulation Pumps J Service Notification...

Страница 6: ...reference is included to specify the Near Boiler Piping specific to the Knight boiler This piping scheme is important for proper operation of the SMART SYSTEM control See the Knight Boiler Installati...

Страница 7: ...1 Service Service Manual 7 1 Service continued The Knight boiler display...

Страница 8: ...1 Service 8 Service Manual 1 Service AIR PRESSURE SWITCH Control inputs...

Страница 9: ...tinued LOW VOLTAGE CONNECTION BOARD SMART CONTROL MODULE ALARM BELL AUX DEVICE RELAY RUN TIME CONTACTS SEQUENCER BUILDING MANAGMENT SYSTEM BOILER PUMP SYSTEM PUMP DHW PUMP IGNITOR BLOWER GAS VALVE DIS...

Страница 10: ...can be based on boiler outlet water temperature boiler return water temperature or system supply temperature depending on the parameter setting Sequence of operation Table 1 shows control module norm...

Страница 11: ...prepurge cycle is complete and the blocked drain switch and auto reset high limit are closed the control starts the 5 second trial for ignition by sending spark voltage to the spark electrode and open...

Страница 12: ...ng set point As long as both the space heating and DHW calls for heat remain active the control will switch back and forth between the two modes until one of them is satisfied BLR SH 41 RATE OUT 123 0...

Страница 13: ...1 Service Service Manual 13 1 Service continued Display panel menu access Table 2 Use this procedure to access menus from the display panel...

Страница 14: ...1 Service 14 Service Manual 1 Service Display panel parameter access Table 3 This is a typical example of accessing a parameter shown for parameter I2 boiler pump delay...

Страница 15: ...s Yes 4 SH Offset 17 No No Yes Yes 5 SH Differential 18 No No Yes Yes C 1 Hours Running SH 18 Yes No Yes No 2 Hours Running DHW 18 Yes No Yes No 3 Ignition Attempts 18 Yes No Yes No 4 Show Last 10 Err...

Страница 16: ...turn Temperature Differential for Ending Anti Cycling 20 No No Yes Yes 3 Ramp Delay On Off 20 No No Yes Yes ANTI CYCLING H 1 SH Controlling Sensor Outlet System Inlet 21 No No Yes Yes 2 SH Source Ther...

Страница 17: ...0 F to 190 F The default value is 125 F SH minimum set point The SH minimum set point sets the minimum water temperature set point that can be used for space heating operation The user or installer wi...

Страница 18: ...installer by accessing parameter D2 The time range of this parameter is 0 to 40 minutes The default value is 20 minutes E DHW settings DHW boiler set point When a DHW call for heat becomes active the...

Страница 19: ...trol will block all SH demands DHW demands will still be active This parameter can be changed by the user or the installer by accessing parameter F5 The temperature range of this parameter is 0 F to 1...

Страница 20: ...in the display until the time has elapsed or the water temperature drops below parameter G2 This parameter can be changed by the installer by accessing parameter G1 The time range for this parameter...

Страница 21: ...ther The designated Leader boiler determines the total output needed from the group based on the set point and controlling sensor reading It assigns portions of this output to itself Leader and the Me...

Страница 22: ...s adjustable by the installer by accessing parameter I3 The time range for this parameter is 0 minutes to 40 minutes The default time is 30 seconds J Service Notification Service notification in month...

Страница 23: ...allation and Operation Manual Flame inspection stable uniform Flame signal at least 10 microamps at high fire Clean the heat exchanger if flue temperature is more than 54 F above return water temperat...

Страница 24: ...l the air and vent lines per this manual and the Knight Boiler Installation and Operation Manual Inspect boiler interior 1 Remove the front access cover and inspect the interior of the boiler 2 Vacuum...

Страница 25: ...night Boiler Installation and Operation Manual before proceeding further Safety relief valves should be re inspected AT LEAST ONCE EVERY THREE YEARS by a licensed plumbing contractor or authorized ins...

Страница 26: ...attached Check control settings 1 Set the SMART SYSTEM control module display to Parameter Mode and check all settings See Section 1 of this manual Adjust settings if necessary See Section 1 of this...

Страница 27: ...3 Remove the blower assembly gas air arm from the heat exchanger access cover Set bolts aside 4 Remove the nuts securing the heat exchanger access cover to the heat exchanger and set aside 5 Remove th...

Страница 28: ...er on Minimum 4 inches w c natural 8 inches w c LP with gas flowing verify during boiler startup Check control module fuses ALWAYS check control module fuses before replacing control module or any maj...

Страница 29: ...te thermostat satisfied Review remote thermostat setting Outside air temperature above Warm Weather Shutdown WWSD set point for main control board Check location of outside air sensor Check resistance...

Страница 30: ...ble 7C Outdoor Air Sensor Resistance vs Temperature Temperature Resistance Temperature Resistance 50 490 813 20 46 218 40 336 606 30 34 558 30 234 196 40 26 099 20 165 180 50 19 900 10 118 018 60 15 3...

Страница 31: ...an or replace the burner as necessary Low water flow through the heat exchanger Refer to Section 6 Hydronic Piping of the Knight Boiler Installation and Operation Manual for minimum flow rates Verify...

Страница 32: ...for loose or misplaced jumpers if flow switch or LWCO is not installed Blown fuse Replace fuse F2 on the control board see page 28 of this manual Blocked Drain SW will require a manual reset once con...

Страница 33: ...fy that the plastic hose from the gas valve to the air inlet is connected and is not damaged Verify that the vent air intake pipes are correctly installed and that there are no obstructions Check for...

Страница 34: ...main control board If 24 vac is present at the main control board check the wiring between the main control board and the gas valve Replace the wiring if necessary Do not disconnect the wiring from th...

Страница 35: ...sor check temperature setting of the main control board If the optional manual reset high limit has tripped check setting of the device Check resistance of water sensors and compare to Table 7A on pag...

Страница 36: ...g Repair or replace the sensor or wiring if damaged Measure the resistance of the sensors and compare the resistance to the tables on page 30 of this manual Replace the sensor if necessary Sensor Shor...

Страница 37: ...tion and Operation Manual for the proper piping methods for the Knight boiler Check for 120 vac to the boiler pump motor on a call for heat If voltage is not present check the wiring back to the main...

Страница 38: ...d or that the boiler pump is the proper size Reference Section 6 Hydronic Piping of the Knight Boiler Installation and Operation Manual for boiler pump specifications Replace the main control board Re...

Страница 39: ...ain control board if necessary If 120 vac is present on a call for heat and the boiler pump is not operating replace the pump Verify that the boiler pump is set to the proper speed or that the boiler...

Страница 40: ...ions Table 10 Troubleshooting Chart Combustion Levels POSSIBLE CAUSE CORRECTIVE ACTION Vent Air Intake Length or Obstruction Refer to Section 3 General Venting of the Knight Boiler Installation and Op...

Страница 41: ...s or a 1 4 turn clockwise to decrease CO2 levels After performing one adjustment on the valve follow the Combustion Analysis Procedure on page 40 of this manual to measure the combustion If combustion...

Страница 42: ...42 NOTES...

Страница 43: ...43 NOTES...

Страница 44: ...eferences to the pocket pc along with the removal of Models 399 500 Revision 6 ECO C02545 reflects the addition of references to periodic cleaning of screens in vent terminations and safety shutoff te...

Отзывы: