1
Service
12
Service Manual
1
Service
Sequence of operation
(continued)
Table 1A
(continued from previous page) Sequence of operation - space heating and DHW
OPERATION
DISPLAY
8. If the boiler is not part of a cascade, and the DHW call for heat
remains active for more than 30 minutes, and the space heating
call for heat is also active, then the control will turn on the boiler
pump, turn off the DHW pump after 2 seconds, and resume
modulating based on the space heating set point. As long as
both the space heating and DHW calls for heat remain active,
the control will switch back and forth between the two modes
until one of them is satisfied.
BLR: SH 41% RATE
OUT: 123.0F(129)
9. Once both calls for heat are satisfied, the control will turn off the
burner. The blower will remain on for the 10 second postpurge
cycle. Any pumps that are running will continue to run for their
respective pump delay times, then turn off.
BLR: POSTPURGE
OUT: 127.4F(129)
10. Boiler pump off, system pump continues its delay if longer.
BLR: Standby
OUT: 124.7F(129)
11. System pump off.
BLR: Standby
OUT: 122.9F(129)
Содержание KNIGHT 399 - 800
Страница 42: ...4 Notes 42 Service Manual...
Страница 43: ...4 Notes Service Manual 43...