31
Installation & Operation Manual
5
Hydronic piping
Please note that these illustrations are meant to show piping concepts only, the installer is responsible for all
equipment. The installer must follow all manufacturer’s installation instructions for each system component.
The installer is responsible for compliance with local codes.
NOTICE
Figure 5-2 Single Boiler - Recommended - Primary / Secondary Piping with a Hot Water Generator
HOT WATER
GENERATOR
WATER
GENERATOR
CIRCULATOR
BOILER PUMP
FLOW CHECK
VALVE (TYPICAL)
Y-STRAINER
(RECOMMENDED)
RELIEF
VALVE
BALL VALVE
(TYPICAL)
AIR SEPERATOR
DRAIN PORT
(TYPICAL)
SYSTEM
CIRCULATOR
BACK FLOW
PREVENTER
PRESSURE
REDUCING VALVE
PRESSURE
GAUGE
EXPANSION
TANK
12"
MAX
FROM SYSTEM
TO SYSTEM
MAKE UP
WATER
BOILER
DRAIN
SYSTEM RETURN
SENSOR
SYSTEM SUPPLY
SENSOR
IMG01035
System flow should always remain higher than the required flow for the boiler(s) when the boiler(s) is in
operation to prevent short cycling and high limit issues.
NOTICE
Содержание Crest FBL0751
Страница 66: ...Notes Installation Operation Manual 66...
Страница 67: ...Notes Installation Operation Manual 67...