8
Maintenance
60
Installation & Service Manual
IMPORTANT
Upon completion of any testing on the
gas system, leak test all gas connections
with a soap solution while main burners
are operating. Im me di ate ly repair any
leak found in the gas train or re
lat
ed
components.
Do Not
operate an
appliance with a leak in the gas train,
valves or related piping.
Gas Train and Controls
GAS FLOW
Figure 8-4_
Gas Train 90,000 - 399,999 Btu/hr Models
Figure 8-5_
Gas Train 500,000 Btu/hr Model
Review with owner
1. Review the User’s Information Manual with the owner.
2. Emphasize the need to perform the maintenance schedule
specified in the User’s Information Manual (and in this
manual as well).
3. Remind the owner of the need to call a licensed contractor
should the appliance or system exhibit any unusual
behavior.
4. Remind the owner to follow the proper shutdown procedure
and to schedule an annual start-up at the beginning of the
next heating season.
Содержание 000 - 500
Страница 67: ...67 Notes ...
Страница 68: ...Revision A ECO C06290 initial release CFA I S Rev A 09 10 ...