CHAPTER 3: SETTING INTO OPERATION
MOVE S2
Particular attention should be given to the handling of electrical elements because of risks
of electrocution. In case of possible electrical malfunctions, it is advisable to contact LNS
or its local representative. It is strictly prohibited to make adjustments as long as the bar
feeder is under electrical power. The adjustments of the electrical equipment must only be
performed by qualified personnel.
During the installation, ensure that the motor is wired in accordance with the supply voltage available. The
supply voltage of the bar feeder is indicated on the identification plate (point 4).
If the voltage does not correspond, the wiring of the motor must be modified:
Procedure:
Turn the bar feeder off (trigger QS1 and QM1, see below).
Open the main safety cover.
Unscrew the motor cover unit.
Make sure that all motor terminals are off.
Modify the terminal block wiring of the motor according to the diagram above.
Close the cover unit of the motor and the main safety cover.
Turn the bar feeder on (engage QS1 and QM1).
The bar feeder is delivered without oil.
When the bar feeder is aligned and anchored to the ground, fill the hydraulic tank.
Put oil directly in the hydraulic tank.
Quantity :
60 l (17 gallons)
Viscosity :
ISO VG 100
100 mm
2
/s (cSt) à 40°C
Consult your supplier who will recommend the correct oil for you.
To guarantee an optimal operation of the bar feeder, a minimum pressure of 5 bar (75 psi), and a
maximum pressure of 6 bar (90 psi) is mandatory.
Содержание QUICK SIX S2
Страница 1: ......
Страница 2: ...MOVE S2...
Страница 3: ...MOVE S2...
Страница 4: ...MOVE S2...
Страница 5: ...CHAPTER 1 BASIC NOTIONS 3 MOVE S2...
Страница 13: ...CHAPTER 2 TECHNICAL DATA 11 MOVE S2...
Страница 15: ...CHAPTER 2 TECHNICAL DATA 13 MOVE S2...
Страница 16: ...14 CHAPTER 2 TECHNICAL DATA MOVE S2...
Страница 18: ...16 CHAPTER 2 TECHNICAL DATA MOVE S2...
Страница 19: ...CHAPTER 3 SETTING INTO OPERATION 17 MOVE S2...
Страница 33: ...CHAPTER 4 OPERATION 31 MOVE S2...
Страница 57: ...CHAPTER 4 OPERATION 1 MOVE S2...
Страница 60: ...4 CHAPTER 4 OPERATION MOVE S2...
Страница 73: ...CHAPTER 4 OPERATION 17 MOVE S2...
Страница 75: ...CHAPTER 4 OPERATION 1 MOVE S2...