LMS LMS080 Скачать руководство пользователя страница 3

LIGHT MOUNTING SYSTEMS AUSTRALIA – (LMS)                       

UNIT 1, 33 MUSTANG DRIVE, RUTHERFORD NSW 2320

 

INSTRUCTIONS – LMS080

                               

PH: 02 4932 9000   FX: 02 4932 9009   EM: [email protected]

 

OPERATION: 
 

CAUTION: - ALWAYS STAND TO THE SIDE OF OVERHEAD EQUIPMENT WHEN RAISING OR LOWERING 

 
 

Lowering trolley and Equipment 

 
Remove cable cover 

(5) 

and remove cable ties if installed. 

 
Rotate winch handle clockwise to raise trolley off locking lever arm 

(6)

.  

 
Pull  down  on  Locking  Lever  Arm  cable  adjacent  to  winch.  This  will  pull  Locking  Lever  Arm  arm 

(6)

  back  into  track  section 

(1)

 

allowing  head  trolley  to  lower.  Rotate  winch  handle  anti-clockwise  and  lower  trolley  past  retained  locking  lever  arm.  Release 
Locking  Lever  Arm  cable  and  continue  to  turn  winch  handle  anti-clockwise  to  lower  trolley  and  equipment  down  for 
maintenance. 

 
Raising Trolley and Equipment  

 
With trolley in lowered position, turn handle clockwise to wind cable onto winch and raise trolley and equipment 
 
Raise trolley until it passes Locking Lever Arm 

(6)

 which will spring back to normal position after trolley passes.  

DO NOT

 keep winding winch with trolley against stopper 

(7)

 as this will put undue stress on winch cable and may cause damage. 

 
Turn  winch  handle  anti-clockwise  to  lower  trolley  onto  Locking  Lever  Arm 

(6)

  so  trolley  and  equipment  is  not  supported  on 

winch cable. Leave just enough tension on winch cable to keep it tight. 
 
If there is a small amount of slack cable after lowering trolley onto locking arm hand tension cable and install cable ties through 
four holes in winch track section just above winch to keep cable flat on winch track section. 
 
Install cable cover 

(5)

 onto track 

(3)

.  

 
MAINTENANCE: 

 
It is recommended that the following points be inspected or checked for operation whenever system is used. 

1.

 

Operation and condition of winch and cable  

2.

 

Operation of locking lever arm 

3.

 

Attachment point of cable to trolley 

4.

 

Condition of power cable  

5.

 

Condition of track sections 

 

 

Отзывы: