background image

 
 

 

 

Cooled Incubators 

Series 1A, 2, 3 & 4

 

 

 

 

 

 

 

 

Programmable 

Instruction Manual 

 

 

 

 

1 of 31

                                                                        01/12

Содержание 100NP

Страница 1: ...Cooled Incubators Series 1A 2 3 4 Programmable Instruction Manual 1 of 31 01 12...

Страница 2: ...0 Function Overview 10 3 1 Getting Started 11 3 2 Program Run Mode 11 3 3 Display Functions 11 3 4 Example Program 12 3 5 Programmer Function Map 13 14 3 6 Function List Level P Programmer 15 3 7 Mem...

Страница 3: ...pacity 280NP 272 litre capacity Series 2 Models 210NP 135 litre capacity 220NP 200 litre capacity 230NP 290 litre capacity 240NP 420 litre capacity Series 3 Models 100NP 90 litre capacity 200NP 227 li...

Страница 4: ...o provide greater flexibility for individual use making it suitable for a wide range of applications including Study of plants and insects Tissue Culture Seed germination and vernalisation Sample stor...

Страница 5: ...thing Point Electrical Hazard Warning Mains Electrical Supply Within Exhibited where an internal power socket is fitted Refrigeration Isolation Switch Auto Defrost On Off Switch Weee Label Serial Numb...

Страница 6: ...an occur Transportation Series 1A 2 If these cabinets have to be carried it is recommended that at least 2 people assist and that gloves should be used on all occasions The cabinet should be kept upri...

Страница 7: ...els in Series 1A 2 and 3 is of sheet steel finished in white stoved enamel Models in Series 1A have an internal liner of white pre coated Aluminium The internal liner of models in Series 2 is of a hig...

Страница 8: ...so that approximately 100mm of free space exists around the cooled incubator 2 1 7 Adjust levelling foot or feet depending on model so that the cooled incubator is sited firmly Lockable castors where...

Страница 9: ...ogramming instructions please refer to Section 3 or use our quick programming guide at the end of Section 3 2 4 INDICATOR CONTROL LAYOUT Series 1A 2 and 3 The Red safety neon only illuminates when an...

Страница 10: ...en Pasted into another that it will replace For safety reasons three modes of recovery from a power failure are available These either automatically Re start the Program from the beginning Continue it...

Страница 11: ...s Qt and hold for 3 seconds to hold the program Press Qt again and hold for 3 seconds to run the program Note Level P is read only while a program is active To run a stopped program again press and ho...

Страница 12: ...unction Interval 45 mins Step Function Target setpoint 85 deg TYPE TYPE TYPE SPRR PCYC SPRR 55 1 105 T SP T SP 30 137 TYPE TYPE TYPE SOAK STEP SPR SINT T SP SPRR 45 85 55 T SP 30 Ramp Function Rate 55...

Страница 13: ...rogram 3 now appears Hold the in list program at current position PROG 2 Start program when on selected This locks other options out EDIT SURE Q Q s DEL NO 3 secs Hold the program at RUN FAIL the poin...

Страница 14: ...full SEG Program TYPE 3 re cycles LOOP Segment 3 now appears in menu TYPE Step STEP SEG 2 TYPE Soak SOAK Q s Ramp Q s SEG TYPE 1 s SPR PCYC 1 Soak time in minutes or continue Default 10 SINT 10 Import...

Страница 15: ...ocess value SP Setpoint value hour Ramp rate adjust in hours 60 s Ramp rate adjust in minutes 1 Add new segments 1 to 126 k SPrr 100 Setpoint ramp rate Units per hour minute 0 9990 as set at Spru abov...

Страница 16: ...3E SP2A and SP3A energised to mark event 2d 3E SP2A de energised SP3A energised to mark event To Return to LEVL P Press and hold t To Read Programmer memory used USEd Press Q and t together in LEVL P...

Страница 17: ...ions shown as white characters on black background have Default settings EDIT COPY Q3secs PROG RUN 1 OFF PROG 1 SEG ADD SEG 5 SEG 4 SEG 3 SEG 2 KEY t OR s TO VIEW FUNCTIONS Program Segment Configurati...

Страница 18: ...display reads Prog Add Press button until display reads Stu Pu Press and hold and press display reads Stu SP Press button until display reads SEG Add Press button until display reads type SPR Press a...

Страница 19: ...s button display reads SEG Add Press button display reads type SPR Press and hold and press button until display reads type Step Press button display reads t SP 0 0 current set point Press and hold an...

Страница 20: ...PCYC 1 Press and hold and press button until display reads PCYC Cont Press button display reads EOP 3D Press button until display reads SEG 5 Press and hold both the and buttons together for 3 seconds...

Страница 21: ...or the quick programming guide Models fitted with a 24 hour or 7 day time clock require the segments to be adjusted by pulling outwards or pushing in according to requirements Each small segment repre...

Страница 22: ...ed alarm option fitted to the instrument s front panel When fitted this instrument supplements the digital control on the control panel with a contact thermometer having a Red upper limit pointer and...

Страница 23: ...on the cassette with the paper unrolling from the bottom With the chart retaining bracket 5 lifted feed the paper onto the sprocketed paper driving wheels 6 Close chart retaining bracket 5 and check...

Страница 24: ...gainst the chart paper In this case the recorder chart motor should be operated for a few seconds until the imprint pressure is released or the imprint drive wheel 12 can be manually rotated The chart...

Страница 25: ...ce engineer The exterior and interior surfaces can be maintained in as new condition using standard non abrasive or non corrosive cleaners Solvent based cleaners must not be used Switch off during all...

Страница 26: ...6 1 7 If it is found subsequently that the purchaser of the equipment was responsible for the damage malfunction a charge will be made by LMS including any carriage charges 6 1 8 If it is necessary t...

Страница 27: ...PARES SERVICING AND REPAIRS 6 2 Please contact LMS Ltd The Modern Forge Amherst Hill Riverhead Sevenoaks Kent TN13 2EL Tel 01732 451866 Fax 01732 450127 Email sales lms ltd uk www lms ltd uk 27 of 31...

Страница 28: ...6 3 28 of 31 01 12...

Страница 29: ...Fax Back Guarantee Registration To qualify for the 2nd year guarantee please fax this form duly completed to 01732 450127 Name Address Tel No Contact Name Date Purchased Model No Serial No 29 of 31 01...

Страница 30: ...ent Among the services provided are Periodic service and safety inspection Calibration services to traceable standards Emergency breakdown cover Preparation for insurance inspection UKAS Accreditation...

Страница 31: ...UGE DIGESTION BLOCK INCUBATOR STERILIZER CHILLER FREEZER LABORATORY FRIDGE WATER BATH CLIMATIC CHAMBERS FRIDGE FREEZER LABORATORY OVEN COOLED INCUBATOR FURNACE MEDIA PREPARATOR PLEASE LIST THESE AND A...

Отзывы: