
EN.33.C.39.2022-01-14
Assembly instructions | LK Electric Portable Boiler
Technical data
Article no.
241 84 64
Output
9 kW in two stages at 4.5 kW
Voltage
3 N~ 400V AC, connection via
3-phase electric plug
Boiler must be protected using
3 x 16 A fuses (max. current
13.5 A)
Electrical cartridge
9 kW/6-tube 400 V, stainless
steel SS2353, connection 2”
Pump
Grundfos UPM3 Auto 15-70 1
phase 230V AC (factory fitted
to control box)
Protection class
IP 44
Input power circulator
5-52 W
Operating thermostat
Max 60 ºC
Safety thermostat
80 ºC
Expansion tank
12 litres
Safety valve
1,5 bar
Max. glycol solution
30%
Boiler volume
2,8 litres
PS max. pressure for
boiler jacket
1,5 bar
Dimensions (L x W x H) 710 x 430 x 650 mm
Weight
23 kg
Condensing boiler
No
Low-temperature boiler No
B1 boiler
No
Cogeneration space
heater
No
Rated heat output
P
märk
9 kW
Useful heat output
P
märk
9 kW
Energy class
D
Seasonal space heating
energy efficiency
η
s
36%
Useful efficiency
η
s
39.4%
Auxiliary electricity
consumption
On standby P
SB
0.025 kW
Standing loss
P
stby
0.101 kW
Recycling
The boiler should be recycled after dismantling.
Insulation is removed and sorted as insulation.
The boiler body and stand should be sorted as
scrap steel. Electronics and electronic compo-
nents should be sorted as electrical scrap.
Safety valve
The safety valve must be tested at start-up and
then at set intervals 2-3 times per year. CAU-
TION: Take care when testing as the out-flowing
water/steam can cause scald injuries.
Pump graph
Electric connection diagram
LK Systems AB, Box 66, 161 26 Bromma, Sweden | www.lksystems.se
3 (3)
English