11
4 Installation
4 1 Checking the Outer Packing
.
a When receiving the inverter check that the packing materials are intact
.
,
.
.
,
,
,
b After unpacking check that the deliverables are complete intact and consistent with your
order list.
c Examine the PV inverter and its fittings for damage such as scraps and cracks
.
.
Do not install the inverter on flammable building materials or in an
area that stores flammable or explosive materials
.
Do not install the inverter in a place where personnel are likely to
come into contact with its enclosure and heat sinks to avoid electrical
shock/burn
.
Figure 4 1 The deliverables: The inverter and its fittings
.
CAUTION
DANGER
AC output connector
The inverter
Items
Deliverables
File package
Rear panel
A
F
G
E
D
C
B
Bolt group (including screw, nut)*3
(reserved for tighteningthe support and rear panel)
M6 screw
DC terminal connector group
The deliverables in the fittings of inverter
G
Содержание GT3-17K-D
Страница 1: ...Ver 00 GT3 17K 30K...
Страница 47: ......