Precut Value Shed Manual
Gambrel Barn
Construction Manual © 2008-2009 Little Cottage Co. Page 7
37
38
39
40
41
42
Now locate the rafter. See diagram to match truss
A, B, and C. Secure with 3” nails.
Next place the truss as shown and fasten with 1
1/4” blackheaded screw.
Make sure the truss is flush on top and outside
with OSB as shown before fastening.
Nail the truss on 2x4 where notched.
Install 48” 2x4’s flat for temporary bracing.
Secure with 2 1/2” screws.
Continue with bracing.