Colonial Gable Greenhouse
AssEmbLy InsTruCTIOn mAnuAL
2
© 2019 Little Cottage Co.
Assembly Instruction Manual
1.
Thank you for purchasing from Little Cottage
Co! Begin your kit by locating the 4x4 pressure
treated runners. Place them roughly 6’ apart.
2.
Next locate 2x4’s for floor.
3.
Make sure joist and rim are flush as shown and
secure with 2 1/2” screws.
4.
Next measure 13” from outside to 4x4 runner.
5.
Use square to place 4x4 as shown.
6.
Make sure 2x4 and 4x4’s are flush. Secure with
2 1/2” screws on angle as shown.