Orange Alpaca
Building instructions v1.0
Страница 1: ...Orange Alpaca Building instructions v1 0...
Страница 2: ...cooperation or endorsement is implied 2 Table of contents Table of contents 2 Components 3 PCB layout 3 Building sequence 4 Modifications 4 Mode switch 4 Off board wiring 5 Troubleshooting 6 Schemati...
Страница 3: ...p 100p 10p 100p MLCC Ceramic C6 10u 10u 10u 10u Electrolytic C7 x 33n x 33n SMF MKT Wima D1 x 1N4001 x 1N4001 IC1 CD4049UBE CD4049UBE CD4049UBE CD4049UBE P1 B1M B1M B1M B1M Drive P2 x B100k X B100k Hi...
Страница 4: ...ace the IC and diodes transistors if socketed Wait until after you soldered the potentiometers and switch The Mode switch SW1 controls the range Drive P1 You can either use a PCB mounted switch SPDT o...
Страница 5: ...age to the left shows how you can recognize which pin is which on a potentiometer You can break off the pin I marked with the yellow circle with a small pair of pliers SW1 is a regular PCB mounted SPD...
Страница 6: ...ectly and or soldered correctly on the board Check that you oriented the capacitors IC s transistors and diodes the right way SMF MKT and ceramic capacitors as well as resistors do not need to be orie...
Страница 7: ...mes are mentioned solely for circuit identification and where applicable their trademarks are the property of their respective owners who are in no way associated or affiliated with the author No coop...