Introduction
The 22.5kW Power System is a 3-phase, 10-slot chassis with 2.5KW Power Supply Units (PSUs) that
provides stable DC output power (12.5VDC / 1800A). This 21-inch power system uses up to 10 high-power,
hot-swappable PSUs for flexibility in full power or redundant operation. For more information about the
22.5kW Power Shelf, refer to the
Lite-On 22.5kW Power Shelf Datasheet
.
The 2.5kW PSUs efficiently supply both main output DC power and standby DC power from either AC or DC
sources. These compact PSUs provide 2.5kW, 12.5V / 200A for main power output and 30W, 12V / 2.5A for
standby power applications. In addition, they support PMBUS 1.2 with boot loader, LED status indicators,
and circuit protection features. For more information about the 2.5kW PSU, refer to the
Lite-On 2.5kW
Power Supply Unit Datasheet
.
This user guide provides instructions to install and use the 22.5kW Power System. For instructions on initial
startup, refer to the
Lite-On 3-Phase 22.5kW Power Supply System Startup Guide
.
General Safety
This user guide uses the safety conventions described below. Ensure that you follow the safety instructions
in this guide and observe its directives to protect you from injury and to protect your equipment from
damage.
WARNING
Indicates highly-dangerous consequences such as fire, serious injury, or death when
failing to comply with the instructions.
Caution
Indicates dangerous consequences such as moderate injury or equipment damage when
failing to comply with the instructions.
Required Tools for Installation and Maintenance
The following tools are required for installing and maintaining the Power System.
•
#2 and #3 Phillips screwdrivers
•
Flat blade screwdriver
•
T-20 star driver for input power connector
•
10mm and 13mm wrenches for connecting linking bus bars
•
Digital Multimeter (DMM) for testing and verifying power
•
Torque driver to tighten connectors and cables
Unpacking and Checklist
Carefully unpack the rack, Power Shelf, and Power Modules and move them to the staging area for
assembly. It is recommended that you keep the packaging in case equipment needs to be returned to the
supplier.