5.7. Turning on the machine
Before turning on the machine, the following conditions must be checked:
Acceptance of the workpieces at the output side of the machine is
ensured.
Contaminants (material residue) have been removed from the magnets.
Workpieces remaining in the machine
(visual inspection on the conveyor belt) have been removed.
Power-pin belts are checked for damage (visual inspection).
Place the main switch
(11)
on the back of the machine into the "On"
position.
The power supply for the drives is turned on.
Make sure that all malfunctions are corrected.
Ensure that both »EMERGENCY STOP«
buttons (10)
and
(17)
are
disengaged.
The machine is ready for operation.
Before slag removal can begin, the following pre-requisites must be met:
The sheet thickness of the workpiece is measured and set on the
machine.
Feed speed is set.
Top and bottom machining units are correctly positioned.
Deslagging machine SBM-M 1000/1500 D2
31
Содержание SBM-M 1000 D2
Страница 2: ......
Страница 13: ...Safety Notes Deslagging machine SBM M 1000 1500 D2 13 ...
Страница 55: ...Warranty conditions Deslagging machine SBM M 1000 1500 D2 55 ...