background image

LIQU

A

GEN 5 ST

A

GE RO INSTRUCTION MANU

AL

INSTALLATION MANUAL

6 STAGE RO/DI

PRODUCT PART NUMBER: 

2-OS-75

[email protected][email protected]

EMAIL:

Phone Support : (951) 400-3365

CONTACT:

1379 Pico St Suite 104, Corona, CA 92881, USA

ADDRESS:

TM

Содержание 2-OS-75

Страница 1: ...O INSTRUCTION MANUAL INSTALLATION MANUAL 6 STAGE RO DI PRODUCT PART NUMBER 2 OS 75 sales liquagen com warranty liquagen com EMAIL Phone Support 951 400 3365 CONTACT 1379 Pico St Suite 104 Corona CA 92...

Страница 2: ...hen replacing your lter you have the option between two di erent kits The DIY kit will require you to empty your current DI canisters to ll them with new resin Your other option is the pre lled cartri...

Страница 3: ...needstobechangedout PressureDrop When the DI Resin TDS increases above 25 is an indicatorthe membrane is depletedandthemembraneneedstobechangedout Your lters need to be replaced every 6 to 12 months d...

Страница 4: ...ded use equipment modi cations unauthorized repairs improper installation damage from freezing hot water re or other acts of god outside of LiquaGen s control Filters are not under warranty as the ser...

Страница 5: ...al enough to warrant a booster pump As it approaches 35 PSI mark the performance drop will become signi cant and you will likely want to purchaseaboosterpump Yes the air gets trapped in the top of the...

Страница 6: ...advise at least 50 to 85 PSI for optimal performance Low water pressure puts stress on the membrane leading to more wastewater and less production Adding a booster pump or low pressure membrane are th...

Страница 7: ...no storage tank or a oat valve no backpressure will be created thus the system will continue to run Both components are only to be used if your set up includes a oat valve or storage tank to hold the...

Страница 8: ...f the membranes operate at 80 capacity regardless of the brand GPD refers to gallons per day Reverse Osmosis systems are rated in the numberofgallonstheyproducein24hours Only under perfect conditions...

Страница 9: ...igned with a Manual Flush Valve This helps ease the processof ushingthesystembeforeusage After installing the system you need to ush the membrane for 20 30 minutes DIRECTIONS IMAGE 1 IMAGE 2 Let the w...

Страница 10: ...ut Put Te on tape on the extra elbow which can be found in the box With your hand twist them on where the broken elbow was Do not tighten the elbows too much as they might break FIG 1 FIG 2 PLEASE NOT...

Страница 11: ...ply BLACK TUBING Installed in stage 4 RO Membrane Housing It s rejected water and is essentially the water which is too impure to pass through your system This should go directly to your drain and we...

Страница 12: ...GE2 is how the unit should look like IMAGE 1 IMAGE 2 08 STEP 2 ELBOW CONNECTOR 07 We provide extra Te on tape connectors for emergencies STEP 3 INSERTING THE FITTINGS Screw the elbow on to both sides...

Отзывы: