Rev: 10.15.20
Page 6
CCD-0003688
6.
Using an impact driver, securely fasten all screws using a crisscross pattern (Fig. 4) until screw heads
are nearly flush against the lock washers.
7.
Torque screws 10 - 12 Nm in the crisscross pattern shown in figure (Fig. 4).
8.
Make sure the controller is level (parallel) with the front crossmember of the caravan frame.
9.
Make sure controller orientation is correct (Fig. 4).
Sway Command Wiring
All electrical wiring harnesses shall be loomed and secured to prevent possible damage and
installed in accordance with best shop practices.
The wiring harness (OEM-provided) can be routed at any time before post-installation testing, but can only
be plugged into the brake loom after the brake loom has been routed.
Note:
All wiring connections should be made at the caravan junction box according to local codes. LCI
recommends the use of a 20A user-replaceable/sealed fuse between the junction box power
connection and the black Sway Command
power connection.
1.
Plug the Sway Command loom into the axle loom connector.
2.
Route the wiring harness from the controller module connector location to the front of the chassis
frame where the controller module is mounted.
3.
Secure the wiring harness every 300 mm (12 inches) to the vertical rail.
4.
After the floor has been installed, but prior to testing, install an OEM-provided black saddle with two
OEM-provided M8 x 18 x 12 mm self-drilling pan head screws to fasten the cable against the floor.
Note:
Excess wiring shall be coiled up and secured within the rail such that it will not hang loose.
5.
Insert the OEM-provided harness plug into the controller module's connector until it clicks
into position.
Sway Command Light Pod Mounting
The light pod should be mounted in a location that can be easily seen by the tow vehicle operator. If the
light pod is mounted to the A-frame of the caravan (Fig. 5), make sure it is mounted on the driver’s side of
the caravan for clear visibility. Optionally, the light pod can be mounted to the outside, front wall of the
caravan (Fig. 6) and positioned for visibility by the tow vehicle operator.
Note:
The light pod can be fastened to the A-frame at any time, but can only be connected after the
A-frame loom has been routed.
Mounting the light pod on the A-frame:
1.
Determine the proper mounting location for the light pod.
2.
Fasten the light pod (Fig. 5A) in place next to the A-frame loom hole (Fig. 5B) with two
M8 x 18 x 12 mm self-drilling pan head screws (Fig. 5C).
Fig. 5
C
A
B