
Rev: 06.12.19
Page 5
CCD-0002310
Fig. 5
Fig. 6
Fig. 7
A
A
Operation
OneControl
®
Control Panel
1.
The control panel will operate various devices connected to the OneControl® system.
2.
Locate “OneControl® Control Panel” (Fig. 5).
3.
Pressing the “OneControl® Control Panel” (Fig. 5A) will open “OneControl® Applications”.
4.
Pressing the "Tank Monitor" icon (Fig. 6A) will allow you to access the tank monitor screen (Fig. 7).
NOTe:
The indicator panel light will be depicted by the use of the tank; a gray line for the gray tank, a blue
line for the blue tank, etc.
NOTe:
Only the tanks used and configured will be displayed on the screen.
NOTe:
Battery voltage is also displayed on the monitor panel screen (Fig. 7A).
A