Shenzhen Linshang Technology Co., Ltd.
3/12/2022 Page 10 of 13
A. Each project bar can preserve the latest 8 sets of measurement data.
B. There are 17 projects totally for different parts of the car. (From top to bottom: car roof, engine
compartment cover, left front fender, left A-pillar, left front door, left B-pillar, left rear door, left C-pillar,
left rear fender, trunk lid, right rear fender, right C-pillar, right rear door, right B-pillar, right front door,
right A-pillar, right front fender).
C. The specific part name of the car that we test will be displayed at the upper left corner of each bar.
D. The “
清空
(Empty)” button corresponding to each project bar can clear the measurement data of this
bar.
E. Select the “
清空所有数据
(Clear All Data)” button in the upper left corner to clear all measurement data
and automatically return to the first bar to prepare for measurement.
5.4 Report Preview
Click on the "
预览报告
(Preview Report)" button at the top, the user can input information according to their
needs, or choose not to input any information.
Click "
确定
(Confirm)" to generate a report preview.