background image

OPERATOR’S MANUAL

1

OPERATOR’S 

MANUAL

LINKIT

® 

Series LKS300/LKS450 Portable Conveyor

InterQuip USA LLC 

203.322.2600 

        interquip.net

DISTRIBUTED BY:

Содержание LKS300 Series

Страница 1: ...OPERATOR S MANUAL 1 OPERATOR S MANUAL LINKIT Series LKS300 LKS450 Portable Conveyor InterQuip USA LLC 203 322 2600 interquip net DISTRIBUTED BY...

Страница 2: ...ad understand and obey the manufacturer s instructions and safety rules safety and operator s manuals and machine decals employer s safety rules and worksite regulations applicable governmental regula...

Страница 3: ...ossible hazards Do not use the machine whilst under the influence of alcohol or drugs Ensure machine is securely fastened at the top and brakes are on before use Do not alter or disable machine compon...

Страница 4: ...correct PPE COMPONENT DAMAGE HAZARDS When using a generator ensure it is fitted with a voltage regulator before use Do not over load the machine 330 LBS MAX belt load Do not use machine as a ground fo...

Страница 5: ...Conveyor 1 Drive Drum 2 Bottom Belt Adjuster 3 Folding Wheels 4 Power Input Socket 5 Hopper 6 Wheel 7 Wheels Locking Pin 8 Scaffold Holes 9 Controls 10 Emergency Stops 11 Forklift Pockets 12 Main Belt...

Страница 6: ...OPERATOR S MANUAL 6 CONTROLS LINKIT LKS300 LKS450 Series Portable Conveyor 1 Emergency Stop 2 Forward 3 Neutral 4 Reverse 5 Fast Slow...

Страница 7: ...a machine before the operator performs the function tests The pre operation inspection also serves to determine if routine maintenance procedures are required Only routine maintenance items specified...

Страница 8: ...it was intended FUNDAMENTALS The function tests are designed to discover any malfunctions before the machine is put into service The operator must follow the step by step instructions to test all mach...

Страница 9: ...or determine if the workplace is suitable for safe machine operation It should be performed by the operator prior to moving the machine to the workplace It is the operator s responsibility to read and...

Страница 10: ...operator s safety and responsibilities manuals This conveyor was designed to transport solid non liquid non dangerous material such as stone sand rubble and soil The material must be loaded responsibl...

Страница 11: ...in Fig 1 Push wheels into position and let go of pin The pin should engage into locking plate Fig 2 Lower machine safely onto the ground Do not drop machine 3 Fit hopper to base of machine Align the s...

Страница 12: ...manual handling techniques 5 Once machine is in place Plug in power supply Start pre operation checks 6 When using more than one conveyor Setup the first conveyor and work forwards When you are happy...

Отзывы: