![Linkam Scientific Instruments THMS600 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/linkam-scientific-instruments/thms600/thms600_general-manual_1923502010.webp)
Water Cooling Connections
•
When heating above 300
o
C, stages require water
cooling to keep the stage body and lid cool. Contact
DP staff (2-9490;
) for a water
circulator.
•
There are several options for cooling:
– Linkam ECP Water Circulating Pump
• It may be necessary to prime the ECP if the water
connectors have been removed.
• DP circulating pump with custom housing
• To ensure proper circulation, be careful to avoid introducing
air into the system. While connecting and disconnecting,
take care to prevent water from leaking out.
• Beamlines may use their own small, recirculating chiller.
(less than 20CC/min flow rate)