
*
ESTIMATED
he ig ht a nd insta lla tio n time (b a se m o d e l).
HIG HER TRIM LEVELS REQ UIRED A DDITIO NA L INSTA LLA TIO N TIME.
ADAPT SOLUTIONS
05-2020
LINK
REFERENCES
LK- F150C 09L
Se a t he ig ht:
INFO N/ A
*Transfer height: 19”|
A ve ra g e insta ll: 8- 10 hrs (Ra p to r 10- 12 hrs)
O EM shro ud s must b e trim me d .
Se a t a djustm e nts|FRO NT:
INFO N/ A
|BAC K:
INFO N/ A
Insta lla tio n time va rie s d e p e nd ing o n O EM fe a ture s inte g ra te d in the se a t.
Ke e p ve nte d se a ts.
Exte nsive wire ha rne ss wo rk re q uire d o n fully e q uip pe d m o de ls. (Ad d tim e )
O EM wire ha rne ss m ust b e c ut a nd e xte nd e d unde r se a t.
O EM wire ha rne ss m ust b e c ut a nd e xte nde d unde r se a t.
Ke e p ve nte d se a ts.
O EM shro uds m ust b e trim m e d.