Link 7224E000 Скачать руководство пользователя страница 5

 

7. SERVICE 

 

Procedure for replacing an inoperative actuator: 

1.  If the deck is lowered, or can be lowered, skip to step 6.  If the deck is raised and stuck, complete steps 2 

through 5 before proceeding.   

2.  If the deck is loaded, remove the load if possible. 
3.  Place jack stands or blocks under the top deck to support it in the raised position while preparing it to be 

lowered. 

4.  If necessary, use a jack or forklift to lift the top deck slightly, to free the actuators and actuator pivot bolts. 

5.  Disconnect the inoperative actuator(s) from the control wiring harness.  Unfasten the inoperative actuator(s) 

from the torsion arm weldment and the actuator mount.   

6.  Check that no persons or objects are on the lower deck, or in the cargo area, then remove the supports and 

carefully lower the top deck.  If  one actuator is still functioning and connected, lower the top deck using the 
normal operating procedure.  

NOTE: 

One actuator is sufficient to safely lower the top deck, but does not 

have the capacity to raise the top deck while loaded. 

 

If both actuators  were non-functioning and disconnected, use a jack or forklift to carefully lower the top 
deck onto wood blocks placed on top of the lower deck.  The top deck should be held 1-2 in. above the 
lower deck. 

7.  Extend the replacement actuator(s) with an auxiliary 12 volt source, and fit the new actuator(s) to the actua-

tor mount and torsion arm.   

8.  Connect the new actuator(s) to the control wiring harness.  Ensure that all persons are clear of the cargo 

area, and test the operation of the deck through several cycles. 

Procedure for clearing blockages in the DD-2000: 

1.  If the deck is loaded, remove the loads, and lower the top deck, if possible. 

2.  If the top deck is in the raised position, place jack stands under the top deck for support. 
3.  Remove the blockage, working from above the upper deck or from the side door, if possible. 
4.  Inspect the decks, frame, and mechanism for damage. 
5.  Ensure that all persons are clear of the cargo area, and remove the jack stands. 
6.  Test the operation of the deck through several cycles. 

 

Park the vehicle in a level, flat area, and apply the parking brake before performing any maintenance. 

 

Turn the 

“System Lock” 

key switch to the “Off” position and remove the key before performing any 

maintenance. 

 

Perform maintenance work from outside the deck, whenever possible. 

 

CAUTION 

 

The top deck will be free to move if both actuators are disconnected from the torsion arm, and 

Will Fall if 

Unsupported. 

 

Do NOT force out the actuator pivot bolts.  If the pivot bolts are difficult to remove they may still be support-
ing the top deck.  When the load is removed from the actuators the pivot bolts will be easy to remove.

 

 

WARNING 

 

Park the vehicle in a level, flat area, and apply the parking brake before performing any maintenance. 

 

Turn the 

“System Lock” 

key switch to the “Off” position and remove the key before performing any 

maintenance. 

 

Perform maintenance work from outside the deck, whenever possible. 

 

CAUTION 

Содержание 7224E000

Страница 1: ...nter IA USA 51250 2120 712 722 4868 Fax 712 722 4779 www linkcmp com QUESTIONS CALL CUSTOMER SERVICE 1 800 248 3057 The Link DD2000 fits most full size cargo vans 72242112 NOV 28 2017 OPERATION MAINTE...

Страница 2: ...ages that follow this symbol to avoid possible injury or death WARNING WARNING indicates a potentially hazardous situation which if not avoided could result in death or serious injury CAUTION CAUTION...

Страница 3: ...he bier pins if caskets or by placing the legs in the cups hospital cots 5 Raise the top deck and place items to be trans ported on the bottom deck taking care to proper ly secure the load 6 Turn the...

Страница 4: ...torsion bar and replace piv ot bushings or pins if necessary Check for cracks in the framework and decks and repair or replace if necessary Verify that the electrical control system functions as inte...

Страница 5: ...rm 8 Connect the new actuator s to the control wiring harness Ensure that all persons are clear of the cargo area and test the operation of the deck through several cycles Procedure for clearing block...

Страница 6: ...ery and control box NO VOLTAGE Check for voltage at actuator connectors when Control Switch is operated Check for opposite voltage when Control Switch is operated in other direction OK Actuator clutch...

Страница 7: ...7 DD2000 ASSEMBLY PN 7224E000 MEDICAL EXAMINER VERSION PN 7224F000...

Страница 8: ...HEX NYLOCK NUT GR B 8 42 72242121 WELDMENT CROSSMEMBER 1 14 14801200 3 8 UNC SERRATED FLANGE NUT 22 43 72242122 WELDMENT FRAME RIGHT 1 15 14801201 3 8 UNC TOP LOCK FL NUT GR F 4 44 72242123 WELDMENT...

Страница 9: ...C10 8 32 X 1 1 4 OVAL HD MACH SCR SS 8 9 1470 0800 1 4 UNC HEX NUT GR B 4 10 1478 0C00 8 32 UNC HEX NYLOCK NUT GR B ZINC PLT 16 11 1484 0808 1 4 20 X 7 16 SLAB BASE WELD NUT 24 12 14880B00 10 SAE PLAI...

Страница 10: ...1484 0808 1 4 20 X 7 16 SLAB BASE WELD NUT 32 7 72241004 FRAME DECK TOP 1 20 14880B00 10 SAE PLAIN WASHER 14 8 72241005 BRACKET PIVOT TOP 2 21 1506 0033 1 4 20 X 3 4 SOCKET BUTTON HD SS CAP SCREW 16 9...

Страница 11: ...11 LINK MANUFACTURING LTD 223 15TH ST NE SIOUX CENTER IA 51250 1 800 248 3057...

Отзывы: