Linear Technologie LC3.VGVC Скачать руководство пользователя страница 3

1. DESCRIPTION ET FUNCTIONS

1. Charge indicator (indicator lighting in ON position)

2. Complete charge indicator

3. Switch ON/OFF

4. DC input

5. AC adapter

2. LOADING

1. Connect the output plug of the power transformer DC to DC input. After connecting, each 
LED charge indicator will fl ash to be tested before starting the load.

2. The belt transmitter or receiver must be powered by two AA Ni-Cd or Ni-MH.

3. When fully charged, the indicator light turns to green.

3

Отзывы: