B-8
B-8
OPERATION
POWER MIG 300
5. Rotate the spindle and adapter so the retaining
spring is at the 12 o'clock position.
6. Position the Readi-Reel so that it will rotate in a direc-
tion when feeding so as to be de-reeled from top the
of the coil.
7. Set one of the Readi-Reel inside cage wires on the
slot in the retaining spring tab.
8. Lower the Readi-Reel to depress the retaining spring
and align the other inside cage wires with the grooves
in the molded adapter.
9. Slide cage all the way onto the adapter until the
retaining spring "pops up" fully.
Check to be sure the retaining ring has fully returned to the locking
position and has securely locked the Readi-Reel cage in place.
Retaining spring must rest on the cage, not the welding electrode.
-----------------------------------------------------------------------------------------------
10. To remove Readi-Reel from Adapter, depress retain-
ing spring tab with thumb while pulling the Readi-
Reel cage from the molded adapter with both hands.
Do not remove adapter from spindle.
FIGURE B.4
TO MOUNT 10 to 44 Lb. (4.5-20 kg) SPOOLS (12"/300
mm Diameter) or 14Lb.(6 Kg) Innershield Coils:
(For 13-14 lb. (6 Kg) Innershield coils, a K435 Coil
Adapter must be used).
1. Open the Wire Drive Compartment Door
2. Depress the Release Bar on the Retaining Collar
and remove it from the spindle.
3. Place the spool on the spindle making certain the
spindle brake pin enters one of the holes in the
back side of the spool (Note: an arrow mark on the
spindle lines up with the brake holding pin to assist
in lining up a hole). Be certain the wire comes off
the reel in a direction so as to de-reel from the top
of the coil.
CAUTION
PROCEDURE FOR CHANGING
DRIVE AND IDLE ROLL SETS
1. Turn off the power source.
2. Release the pressure on the idle roll by swinging
the adjustable pressure arm down toward the back
of the machine. Lift the cast idle roll assembly and
allow it to sit in an upright position.
3. Remove the outside wire guide retaining plate by
loosening the two large knurled screws.
4. Twist the drive roll retaining mechanism to the
unlocked position as shown below and remove the
drive roll. (See Figure B.3)
5. Remove the inside wire guide plate.
6. Replace the drive and idle rolls and inside wire
guide with a set marked for the new wire size.
NOTE: Be sure that the gun liner and contact tip
are also sized to match the selected wire size.
7. Manually feed the wire from the wire reel, over the
drive roll groove and through the wire guide and
then into the brass bushing of the gun and cable
assembly.
8. Replace the outside wire guide retaining plate by
tightening the two large knurled screws. Reposition
the adjustable pressure arm to its original position
to apply pressure. Adjust pressure as necessary.
WIRE REEL LOADING - READI-REELS,
SPOOLS OR COILS
To Mount a 30 Lb. (14 kg) Readi-Reel Package
(Using the Molded Plastic K363-P Readi-Reel
Adapter):
1. Open the Wire Drive Compartment Door
2. Depress the Release Bar on the Retaining Collar
and remove it from the spindle.
3. Place the Optional Adapter on the spindle
4. Re-install the Retaining Collar. Make sure that the
Release Bar
“
pops up
”
and that the collar retainers
fully engage the retaining ring groove on the spin-
dle.
LOCKED POSITION
UNLOCKED POSITION
FIGURE B.3
Содержание POWER MIG 300
Страница 43: ...DIMENSION PRINT F 5 POWER MIG 300 F 5 3 00F M19231 ...
Страница 44: ...NOTES POWER MIG 300 ...
Страница 45: ...NOTES POWER MIG 300 ...