
33
44
88
10A
10A
99
77
5B
5B
1B
1B
1C
1C
1A
1A
10B
10B
10C
10C
22
66
5A
5A
3
3
4
4
8
8
10A
10A
9
9
7
7
5B
5B
1B
1B
1C
1C
1A
1A
10B
10B
10C
10C
2
2
6
6
5A
5A
ENGINE/ROTOR
REMOVAL AND REPLACEMENT
PROCEDURE (continued)
TROUBLESHOOTING AND REPAIR
F-56
F-56
RANGER® 225 GXT
1A. Tolerance Ring
1B. Rotor Thru-Bolt
1C. Blower Fan
2. Kohler Engine
3. Rotor
4. Rotor Shaft Bearing
5A. Brush Bracket
5B. Brush Holder
6. Engine/Stator Mfg. Bolts
7. Stator Lift Bale/Stator
8. Idler Plunger
9. Pull Wire
10A. Idle Spring
10B. Idle Washer
10C. Adjustment Nut
FIGURE F.12 – ENGINE/ROTOR COMPONENT LOCATIONS
Return
to
Section
T
OC
Return
to
Section
T
OC
Return
to
Section
T
OC
Return
to
Section
T
OC
Return
to
Master
T
OC
Return
to
Master
T
OC
Return
to
Master
T
OC
Return
to
Master
T
OC