V300-I
TROUBLESHOOTING & REPAIR
F-27
F-27
Re
tu
rn
t
o Se
ct
io
n T
O
C
Re
tu
rn t
o Se
ct
io
n T
O
C
Re
tu
rn t
o Se
ct
io
n T
O
C
Re
tu
rn t
o Se
ct
io
n T
O
C
Re
tu
rn t
o Ma
st
e
r T
O
C
Re
tu
rn t
o Ma
st
e
r T
O
C
Re
tu
rn t
o Ma
st
e
r T
O
C
Re
tu
rn t
o Ma
st
e
r T
O
C
SWITCH BOARD TEST (CONT.)
Apply Positive Apply Negative
Test Probe to Test Probe to
Terminal
Terminal
Test Result
Conclusion Repair Action
Next Procedure Notes
1/8
12
Greater than
OK
None
Continue
1K ohm
Less than
Shorted
Replace both
Snubber Test
100 ohms
Switch Boards
12
1/8
Less than
OK
None
Continue
100 ohms
Greater than
Open
Replace both
Snubber Test
1K ohm
Switch Boards
9
4/5
Greater than
OK
None
Continue
1K ohm
Less than
Shorted
Replace both
Snubber Test
100 ohms
Switch Boards
4/5
9
Less than
OK
None
Continue
100 ohms
Greater than
Open
Replace both
Snubber Test
1K ohm
Switch Boards
1/8
9
Less than
OK
None
Continue
100 ohms
Greater than
Open
Replace both
Snubber Test
1K ohm
Switch Boards
9
1/8
Greater than
OK
None
Continue
1K ohm
Less than
Shorted
Replace both
Snubber Test
100 ohms
Switch Boards
12
4/5
Less than
OK
None
Continue
100 ohms
Greater than
Open
Replace both
Snubber Test
1K ohm
Switch Boards
4/5
12
Greater than
OK
None
Continue
1K ohm
Less than
Shorted
Replace both
Snubber Test
100 ohms
Switch Boards
NOTE:
K ohm = ohm reading multiplied by 1000.
NOTE:
Always make sure that Switch Boards are changed in matched pairs. Never mix an old style (different
part number) Switch Board with a newer style.
TABLE F.2
SWITCH BOARD RESISTANCE CHECKS