LEFT SIDE
FIRING BOARD
CONTROL BOARD
LEFT SIDE
FIRING BOARD
CONTROL BOARD
FIGURE F.7 – FIRING & CONTROL BOARD LOCATION(S)
TABLE F.2 – LED 7,8 AND 9 CHECKLIST
FIRING BOARD TEST PROCEDURE (continued)
TROUBLESHOOTING AND REPAIR
F-27
F-27
IDEALARC® DC-1500
IF
THEN
LED 7 is ON
AC power is being supplied to the Firing Board
from leads #203 and #204 connected to the phase
angle winding on the T2 Control Transformer.
LED 7 is OFF or is DIMMER
than other LED’s
The proper AC voltage may not be reaching the
Firing Board. Check for loose or faulty connections.
Perform the
LED 8 is ON
AC power is being supplied to the Firing Board
from leads #205 and #206 connected to the phase
angle winding on the T3 Control Transformer.
LED 8 is OFF or is DIMMER
than other LED’s
The proper AC voltage may not be reaching the
Firing Board. Check for loose or faulty connections.
Perform the
LED 9 is ON
AC power is being supplied to the Firing Board
from leads #207 and #208 connected to the phase
angle winding on the T4 Control Transformer.
LED 9 is OFF or is DIMMER
then other LED’s
The proper AC voltage may not be reaching the
Firing Board. Check for loose or faulty connections.
Perform the